Skip to main content
Procore

FINANCIAL: Budgets

 

 

OVERVIEW  

**NOTE THESE PAGES ARE CURRENTLY IN DRAFT FORM.  PLEASE CHECK BACK FOR UPDATES

Subject Matter Experts

  • Jared Cox
  • Renee Phelan

Tool Settings

These settings will be auto setup on your project.  The information below is provided for information.

Click on the GEAR ICON within the tool and set the following:

  • PRIME CONTRACT TOOL
    • CONTRACT CONFIGURATION
      • Number of Prime Contract Change Order Tiers: Tier 2
      • Allow Standard Level Uses to Create PCO's: YES
      • Enable Always Editable Schedule of Values: NO
    • CONTRACT INVOICE SETTINGS
      • Show Markup on Invoice PDF and CSV: NO
    • DEFAULT DISTRIBUTION
      • Prime Contract: Director, Manager, Accountant, Project Assistant
      • Prime Contract Change Order: Director, Manager, Accountant, Project Assistant
      • Prime Contract Potential Change Order: Director, Manager, Assistant
  • BUDGET TOOL
    • Auto-calculate Forecast to Complete by Default: YES
    • Enable Advanced Forecasting: YES
    • Require a Budget Change Adjustment to Change Event association: NO
    • Require net zero Budget Change Amounts: YES
    • Allow budget changes to be billed on owner invoices: NO

 

Brinkmann Standards

  • Budget changes (further details can be found on the Budget Changes page HERE):
    • Budget Changes happen during LOI are completed in Vista (Viewpoint) and re-imported into Procore as needed.
    • Budget Changes that happen after final budgets are set are completed in Procore and exported to Vista.
      • You can keep re-importing the budget from Vista to Procore to update the original budget value as many times as you wan until you do the below steps.
        • Once a budget change is made in Procore - you have to send that back to Vista so that it can reflect properly in Vista
        • After a budget change has been synced, you should now only make changes to the original budget value or further changes all out of Procore and sync back to Vista.
NOTABLE CHANGES TO PAST PROCEDURE  

18000 Phase Codes

  • The 18000 phase codes are no longer an option.
    • With Procore Financials and the utilization of Cost Types, the 18000 Cost Codes are no longer required and available.  Any item that you would have used the 18000 Cost Code previously should be now set up under the appropriate Cost Code and identified with the respective cost type or shown in the forecast to complete column.
      • EXAMPLE:
        • In VISTA: 18000-1: Misc Drywall for $15,000
        • In PROCORE: 9250 Cost Type Other for $15,000

 

Dashes

  • Phase Code dashes will now only be used to represent multiple buildings.
    • You will no longer have the option of adding “dashes” to cost codes. The Cost Types will now take the places of dashes
      • EXAMPLE
        • In VISTA:
          • 9250 Drywall
          • 9250-1 Misc Drywall
        • In PROCORE
          • 9250 Subcontract
          • 9250 Other
      • There is a possible scenario where we have multiple buildings on a project and want to issue subcontracts by building or a scenario where we might have multiple subcontracts by scope of work.
        • This may be a scenario where we will add dashes to properly track these separately within the budget tool in Procore.
        • If you have this scenario, please reach out to Jared Cox and/or Renee Phelan and they can work through this with you.

 

Cost Code 17500

  • When setting up your project, you will include Cost Code 17500 – Fee in your Budget set up and include as the Original Budget Amount the original fee amount.
    • Note:  This is different than how we set up projects in Vista as we didn’t include the fee cost code in the original set up.
  • When you perform your 1st budget projection, you will make the “Estimated Cost at Completion” equal to “0.”

 

Misc Changes

  • You can now utilize multiple cost codes on a commitment (subcontract).  See the commitments walkthrough for further information.
  • You can also write multiple contracts to one cost code.
  • Numbering in Procore for cost codes will look different due to a difference between how Vista lists code vs. how Procore uses it.  This cannot be adjusted.  
COST TYPES  

With Procore Financials, we will be utilizing Cost Types, which are applied to each Cost Code.  Cost Types are a way to identify and classify your project’s job costs and will also generate reports.

  • Approved Cost Types are:
    • Subcontracts
    • Purchase Orders
    • Labor
    • Equipment
    • Material
    • Tax
    • Other

 

Here is a general description of what each Cost Type means

  • Subcontract:  Any commitment that is written
  • Purchase Order: Any purchase order that is written (this DOES NOT include miscellaneous purchase orders that are written out of the Procore forms module)
  • Labor: This is for Brinkmann labor only (inclusive of all field labor, and management staff)
  • Equipment: Examples of this would include any equipment rentals or purchases that occur
  • Material: Examples of this would include miscellaneous material purchases such as rock for a temporary road, lumber for safety rails, or other material purchases
  • Tax: When issuing a Purchase Order, itemize tax on the PO, and create a Cost Type for this amount.  This allows/ensures that we are collecting the appropriate tax for each purchase.
  • Other: Use this cost type for any other item not listed above.
    • Most general conditions other than management and will fall under this cost type.
    • General holds for other misc. cost will fall under this cost type until determined how it will be spent.  (i.e., Miscellaneous Drywall)

 

When setting up your project, you do NOT need to know specifically which cost types each budget line needs to be assigned to for each cost code.  Through Budget Changes, you can transfer money between cost code AND cost type.  See Budget Changes page HERE for more information.

BUDGET VIEWS  

The main budget view is company-wide, and includes a general financial health of the entire project.  Individual budget views can be created on a company-level.  To discuss possible revised Budget Views please contact Jared Cox.  New budget views will need to be applied to projects on a by-project basis.

SNAPSHOT  

A snapshot is a good way to get a single view of how the budget looks at that moment in time.  It is a manual function that should be done by the 15th of each month alongside of monthly projections.  This allows you to have a captured record of the data the Accounting Dept uses for your reference.

Snapshots can be found by accessing the "Snapshot" field in the filter bar above the budget columns.

Budgets should be sent to the ERP directly following a snapshot.

COLUMN INFORMATION  

Think of the budget columns in two large groupings:

  • Original Budget Amount through Projected Budget: Represents contractual agreement with client. 
  • Committed Cost to Estimated Cost of Completion is dollars that is actually spent.

There are two types of column calculations:

  • Source Column: Pulling information from another tool (commitments, prime, etc.)
    • These items are hyper linked to their source.  You can click on the item and open a pop up window to clarify.
  • Calculated Column: Calculated Column = Takes information from source columns and does the associated math for the column. (Example: Contract + Approved Change Order = Amount)
COLUMN DESCRIPTIONS  
  • Description: The Cost Code (Phase) - "Cost Type"
    • Cost Types include Subcontracts, Labor, Material, Tax, etc.
    • NOTE: The format of the Cost Codes was created from an original setup structure in Vista.  Unfortunately, the numbering format cannot be adjusted at this point.
  • Original Budgeted Amount: Source Column - This is the original budgeted amount set up with Accounting at the point of set up.
  • Approved Budget Changes: Source Column - Budget Change Amounts (ICO's)
  • Approved COs: Source Column - All Change Orders in Approved Status
  • Revised Budget: Calculated Column - Original Budget amount + Approved Budget Changes + Approved Change Orders
  • Pending COs: Source Column - Change Orders in Draft Status
  • Projected Budget: Calculated Column - Revised Budget + Pending CO's
  • Committed Cost: Source Column - Approved Subcontracts and Purchase Orders + Approved Change Orders
  • Direct Cost Details: Source Column - Invoices, expenses, misc invoices in Approved status
    • These items are hyperlinked to their source
  • Job to Date Costs: Source Column - Overall costs inclusive of Subcontractor Invoices, Payroll, etc  (This will be Sub Invoices, Concur, etc only if you are using cost types correctly)  
    • You should never have a Direct Cost on a phase code that is either Subcontract or Purchase Order.
  • Pending Cost Changes: Source Column - This is all commitments and change orders that are out for signature.  (If there are items here you need to contact subs to get signed change orders.
  • Projected Costs: Calculated Column - Commitment + Expenses + Pending Change Orders (No forecasting) (ignores job to date amounts)
  • Forecast to Complete: Calculated Column - Anticipated costs above and beyond projected cost.
    • Thunderbolt = automatic logic to determine an amount.
    • Click item to adjust amount manually.  If you have a single lump sum item you would need to set a singular date, with a singular week and the full amount that applies.
  • Estimated Cost at Completion: Calculated Column - Anticipated expenditure amount. Projected Cost + Forecast to Complete
  • Projected Over Under: Calculated Column - Projected Budged - Estimated Cost at Completion

 

POTENTIAL CEs  
  • The Potential CE's column on the budget screen, after projected budget is complete, will include amounts only when a PCO hasn't been created. 
    • Open status will put it in the column.
    • PCO creation will cause the amount to drop off
  • The  amount is not reflected in projections.  Projection columns include only cost and revenue. 

 

PRIME CONTRACT TERMINOLOGY COMMITTED COST TERMINOLOGY

Original Budget = comes from Vista based on your SOV breakdown provided at the point of New Project Setup

Budget Changes = money moved from one phase code to another

Approved Change Orders = pulls from Prime contract tool and includes Prime contract potential change orders with approved status

Revised Budget = Sum of original budget + budget changes + approved Prime Contract change orders

Pending Budget changes = Prime contract potential change orders with a pending status

Projected Budget = Revised budget + pending budget changes

*Approved change orders and pending budget changes pull from the potential change order status, NOT CO Requests or prime contract CO status

Committed costs = commitments (subcontracts and purchase orders) with approved status plus commitment change orders with approved status.

Direct Costs = pull from Vista.  These are direct costs that hit the project not associated with a commitment.

Job to Date Costs = ERP (Vista) Job cost

Pending Cost Changes = Commitments with a status of “out for signature”, commitment change orders with pending status and Purchase order contracts with status of submitted, received, processing, partially received. *Go over this.

Projected Costs = Committed costs + direct costs + pending cost changes

Forecast to Complete = projected budget – projected costs.    **This is auto calculated, can be changed to manually entered when doing forecasting.

Estimated Cost at Completion = Projected costs + forecast to complete

Projected over Under = Projected budget – estimated cost at completion

   

PROCORE STANDARDS & BEST PRACTICES

The Budget tool allows you to build and manage a comprehensive budget throughout a project's lifecycle. By eliminating the need for double-entry of contract modifications and change order values into complex spreadsheets, you'll have greater insight into how seen and unforeseen changes impact the bottom line. Take control over complicated project factors when evaluating and forecasting your project's completion costs.

  • Import an existing budget or build a comprehensive project budget that can be exported to the Microsoft Excel or PDF formats
  • Review financial performance for a single project or across multiple projects
  • Share the status of your budget with your team so they can make informed decisions in the field
  • Generate detailed budget reports showing budget modification, buyout summaries, line item details, and more

There are no items that match your search query.

Configuration Tasks
ERP Integrations
 Tip

To browse and search all Procore training videos, visit our video library.

Set Up a Budget
 
Set Up a Budget - Owner
 
Set Up a Budget - Specialty Contractor
 
Add New Line Items to a Budget - General Contractor
 
Add New Line Items to a Budget - Owner
 
Add New Line Items to a Budget - Specialty Contractor
 
Create a Budget Change
 
Create a Budget Modification
 
Create a Budget Modification - Owner
 
 
 
 
Set Up Budget Views - Specialty Contractor
 
Buyout Savings Budget View
 
Buyout Savings While in a Buyout Budget View
 
Current/Revised Buyout Budget View
 
Budget Forecasts, Projections, and Reports
 
Budget Forecasts, Projections, and Reports - Specialty Contractor
 
Change Order Analysis
 

OUTDATED VIDEOS - Removed from Support Site and Certifications

Specialty contractor as a Client - Set Up Budget Views

 

Owner - Set Up a Budget

 

Owner - Navigate the Forecasting Tab

 

General Contractor - Navigate the Forecasting Tab

 

Specialty Contractor - Navigate the Forecasting Tab

 

Owner - Create a Budget Modification

 

Budget Modifications

 

Owner - Add New Line Items to the Budget

 

Specialty contractor as a Client - Create a Direct Cost

 

Specialty contractor as a Client - Add New Line Items to a Budget

 

Add New Line Items to a Budget

 

Specialty contractor as a Client - Budget Forecasts, Projections, and Reports

 

Specialty contractor as a Client - Setup a Budget

 

Set Up Configurable Budget Views

 

Specialty contractor as a Client - Create a Budget Modification

 

Video content may not accurately reflect the current state of the system, and/or it may be out of date.

Owner - Set Up a Budget

 

Video content may not accurately reflect the current state of the system, and/or it may be out of date.

Owner - Budget Forecasts, Projections, and Reports

 

Video content may not accurately reflect the current state of the system, and/or it may be out of date.

Set Up a Budget
 
Add New Line Items to a Budget - General Contractor
 
Create a Budget Change
 
 
Budget Forecasts, Projections, and Reports
 
Set Up a Budget
 
Add New Line Items to a Budget - General Contractor
 
Create a Budget Change
 
 
Budget Forecasts, Projections, and Reports
 
Set Up a Budget
 
Add New Line Items to a Budget - General Contractor
 
Create a Budget Change
 
 
Budget Forecasts, Projections, and Reports
 
Set Up a Budget
 
Add New Line Items to a Budget - General Contractor
 
Create a Budget Change
 
 
Budget Forecasts, Projections, and Reports
 
Set Up a Budget
 
Add New Line Items to a Budget - General Contractor
 
Create a Budget Change
 
Create a Budget Modification
 
 
Budget Forecasts, Projections, and Reports
 

OUTDATED VIDEOS - Removed from Support Site and Certifications

Budget Modifications

 
Set Up a Budget
 
Add New Line Items to a Budget - General Contractor
 
Create a Budget Change
 
Create a Budget Modification
 
 
Budget Forecasts, Projections, and Reports
 

OUTDATED VIDEOS - Removed from Support Site and Certifications

Budget Modifications

 
Set Up a Budget
 
Add New Line Items to a Budget - General Contractor
 
Create a Budget Change
 
 
Budget Forecasts, Projections, and Reports
 

OUTDATED VIDEOS - Removed from Support Site and Certifications

Budget Modifications

 
Set Up a Budget
 
Add New Line Items to a Budget - General Contractor
 
Create a Budget Change
 
 
Budget Forecasts, Projections, and Reports
 
 

OUTDATED VIDEOS - Removed from Support Site and Certifications

Add New Line Items to a Budget

 
 
Set Up a Budget
 
Set Up a Budget - Owner
 
Set Up a Budget - Specialty Contractor
 
Add New Line Items to a Budget - General Contractor
 
Add New Line Items to a Budget - Owner
 
Add New Line Items to a Budget - Specialty Contractor
 
Create a Budget Change
 
Create a Budget Modification
 
Create a Budget Modification - Owner
 
 
 
 
Set Up Budget Views - Specialty Contractor
 
Buyout Savings Budget View
 
Buyout Savings While in a Buyout Budget View
 
Current/Revised Buyout Budget View
 
Budget Forecasts, Projections, and Reports
 
Budget Forecasts, Projections, and Reports - Specialty Contractor
 
Change Order Analysis
 

OUTDATED VIDEOS - Removed from Support Site and Certifications

Specialty contractor as a Client - Set Up Budget Views

 

Owner - Set Up a Budget

 

Owner - Navigate the Forecasting Tab

 

General Contractor - Navigate the Forecasting Tab

 

Specialty Contractor - Navigate the Forecasting Tab

 

Owner - Create a Budget Modification

 

Budget Modifications

 

Owner - Add New Line Items to the Budget

 

Specialty contractor as a Client - Create a Direct Cost

 

Specialty contractor as a Client - Add New Line Items to a Budget

 

Add New Line Items to a Budget

 

Specialty contractor as a Client - Budget Forecasts, Projections, and Reports

 

Specialty contractor as a Client - Setup a Budget

 

Set Up Configurable Budget Views

 

Specialty contractor as a Client - Create a Budget Modification

 

Video content may not accurately reflect the current state of the system, and/or it may be out of date.

Owner - Set Up a Budget

 

Video content may not accurately reflect the current state of the system, and/or it may be out of date.

Owner - Budget Forecasts, Projections, and Reports

 

Video content may not accurately reflect the current state of the system, and/or it may be out of date.

Budget

diagram_budget_budget-setup.png

diagram_budget_budget-setup_de-de.png

diagram_budget_budget-setup_en-au.png

diagram_budget_budget-setup_en-ca.png

diagram_budget_budget-setup_en-gb.png

diagram_budget_budget-setup_es-es.png

diagram_budget_budget-setup_es-la.png

diagram_budget_budget-setup_fr-ca.png

diagram_budget_budget-setup_fr-fr.png

diagram_budget_budget-setup_ja-jp.png

diagram_budget_budget-setup_pt-br.png

diagram_budget_budget-setup_zh-sg.png

diagram_budget_budget-setup.png

Add a Budget View for Real-Time Labor Costing

diagram_budget_real-time-labor-costing-budget-view.png

diagram_budget_real-time-labor-costing-budget-view_de-de.png

diagram_budget_real-time-labor-costing-budget-view_en-au.png

diagram_budget_real-time-labor-costing-budget-view_en-ca.png

diagram_budget_real-time-labor-costing-budget-view_en-gb.png

diagram_budget_real-time-labor-costing-budget-view_es-es.png

diagram_budget_real-time-labor-costing-budget-view_es-la.png

diagram_budget_real-time-labor-costing-budget-view_fr-ca.png

diagram_budget_real-time-labor-costing-budget-view_fr-fr.png

diagram_budget_real-time-labor-costing-budget-view_ja-jp.png

diagram_budget_real-time-labor-costing-budget-view_pt-br.png

diagram_budget_real-time-labor-costing-budget-view_zh-sg.png

diagram_budget_real-time-labor-costing-budget-view.png

Set Up the 'Procore Labor Productivity Cost' Budget View

diagram_budget_procore-labor-productivity-cost-budget-view.png

diagram_budget_procore-labor-productivity-cost-budget-view_de-de.png

diagram_budget_procore-labor-productivity-cost-budget-view_en-au.png

diagram_budget_procore-labor-productivity-cost-budget-view_en-ca.png

diagram_budget_procore-labor-productivity-cost-budget-view_en-gb.png

diagram_budget_procore-labor-productivity-cost-budget-view_es-es.png

diagram_budget_procore-labor-productivity-cost-budget-view_es-la.png

diagram_budget_procore-labor-productivity-cost-budget-view_fr-ca.png

diagram_budget_procore-labor-productivity-cost-budget-view_fr-fr.png

diagram_budget_procore-labor-productivity-cost-budget-view_ja-jp.png

diagram_budget_procore-labor-productivity-cost-budget-view_pt-br.png

diagram_budget_procore-labor-productivity-cost-budget-view_zh-sg.png

diagram_budget_procore-labor-productivity-cost-budget-view.png

Budget

The following table highlights which user permissions are required to perform the described user action.

icon-mindtouch-table-check.png+ : Indicates that one or more granular permissions are available for the task. See the relevant tutorial or Grant Granular Permissions in a Project Permissions Template for more information.

erp-integration.png : Indicates your company's Procore account must be configured to work with an integrated ERP system

Task None Read Only Standard Admin
Add a Budget Line Item   icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png
Add Budgeted Production Quantities to a Project's Budget       icon-mindtouch-table-check.png
Add the Columns for the 'Budget Changes' Feature to a Budget View This task must be completed in the Company's Admin tool.
Add a Goods & Services Tax (GST) to a Budget 1       icon-mindtouch-table-check.png
Add a Partial Budget Line Item     icon-mindtouch-table-check.png icon-mindtouch-table-check.png
Apply Advanced Forecasting Curves       icon-mindtouch-table-check.png
Apply the View, Snapshot, Group, and Filter Options on a Budget View   icon-mindtouch-table-check.png icon-mindtouch-table-check.png icon-mindtouch-table-check.png
Approve Budget Changes   icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png
Configure Settings: Budget       icon-mindtouch-table-check.png

Legacy  Create a Budget Modification

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png
Create Budget Changes   icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png
Create a Budget Snapshot     icon-mindtouch-table-check.png icon-mindtouch-table-check.png
Create a Custom Budget Report 2       icon-mindtouch-table-check.png
Create a Custom Financial Line Items Report to Compare Budget Snapshots This task must be completed in the Reports tool.
Delete a Budget Line Item     icon-mindtouch-table-check.png icon-mindtouch-table-check.png
Delete Budget Changes   icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png
Edit a Budget     icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png
Edit Budget Changes   icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png
Export a Budget to an Integrated ERP System icon_CL_ERP_Integrations_w50.png       icon-mindtouch-table-check.png
Export Budget Changes   icon-mindtouch-table-check.png icon-mindtouch-table-check.png icon-mindtouch-table-check.png
Import a Budget   icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png
Import Installed Production Quantities for the Labor Productivity Cost Budget View       icon-mindtouch-table-check.png
Lock a Budget   icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png
Read a Budget   icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png
Retrieve a Budget from ERP Integrations Before Acceptance tool-icon_erp-integrations_web-company-level.png   icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png
Set up a Budget in a New Procore Project     icon-mindtouch-table-check.png icon-mindtouch-table-check.png
Send a Budget to ERP Integrations for Accounting Acceptance icon_CL_ERP_Integrations_w50.png   icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png+ icon-mindtouch-table-check.png
Set Up a Budget View for Custom Reporting This task must be completed in the Company Admin tool.
Set Up a New Budget View This task must be completed in the Company Admin tool.
Set Up a New Forecasting View This task must be completed in the Company Admin tool. 
Unlock a Budget       icon-mindtouch-table-check.png
Unlock a Budget with Budget Modifications       icon-mindtouch-table-check.png
Use the 'Forecast to Complete' Feature     icon-mindtouch-table-check.png icon-mindtouch-table-check.png
View Budget Changes   icon-mindtouch-table-check.png icon-mindtouch-table-check.png icon-mindtouch-table-check.png
View Budget Change Detail for a Budget Line Item   icon-mindtouch-table-check.png icon-mindtouch-table-check.png icon-mindtouch-table-check.png
View Budget Reports  3   icon-mindtouch-table-check.png icon-mindtouch-table-check.png icon-mindtouch-table-check.png
View and Filter the Change History of the Budget       icon-mindtouch-table-check.png
Void Budget Changes     icon-mindtouch-table-check.png icon-mindtouch-table-check.png

1 This task also requires 'Admin' permissions on the project's Client Contracts, Funding, or Prime Contracts tool. 

2 Also requires 'Admin' permissions on the Company level Reports tool.

3 The Reports tool must be an active Project Tool. See Add and Remove Project Tools

Below are the notable changes to the project's Budget tool.

Recent Changes

'Status' Filter for Owner Invoices Now Generally Available (08/15/2025)

Procore's new 'Status' filter for 'Owner Invoice' in budget views is now generally available. When an administrator adds the 'Owner Invoice' column to a budget view, your users can now filter budget items by owner invoice status: Draft, Under Review, Revise & Resubmit, and Approved. To learn more, see Set up a New Budget View.

Budget Code Attributes for Work Breakdown Structure Now Generally Available (08/11/2025) 

Procore has introduced the ability to create and assign attributes at the budget code level, enhancing flexibility and customization for users. The Budget tool now supports attribute grouping and filtering, as well as budget export capabilities. This program can be enabled by a user with 'Admin' permissions on the Company Admin tool using Procore Explore. If you don't have Procore Explore, contact your Procore point of contact. To learn more, see About Budget Code Attributes.

Modernized Change History Experience in Budget Tool (08/11/2025)

The user interface for the Budget tool’s Change History page has been modernized to provide a more seamless, user-friendly experience. There is no change to functionality. However, the table has been updated, users can now select cost code, cost type, and sub job filters from drop-down lists or click the Filters button to open a list of filters in the side panel. There is no change to functionality. See View and Filter the Change History of the Budget.

Project Status Snapshots is Now Generally Available (08/11/2025)

Procore is pleased to introduce Project Status Snapshots, which streamlines recurring budget forecasting and status reporting with dedicated budget snapshot types. It also provides instant variance analysis and centralized management for improved project oversight. For details, see About Project Status Snapshots for the Budget Tool. This feature works with the new Company Level Project Status Snapshots tool. 

Beta  New RFQ Status filter on the Budget's Change Event ROM (07/28/2025)

Configure your budget with a new RFQ status filter for Change Event ROM columns, enhancing the accuracy of cost forecasting by distinguishing between committed and potential costs. The RFQ Status filter allows users to configure which RFQ statuses, such as 'Pending' or 'Approved', display ROM values, eliminating cost duplication in forecasts. The Status Filter feature, available through Procore Explore, must be enabled by a user with 'Admin' level permissions to the Company Admin tool. To learn more, see Set up a New Budget View.

Beta  Project Status Snapshots Open Beta (05/12/2025) 

Procore is pleased to announce the start of the Project Status Snapshots open beta program. To join the beta, see Manage Features with Procore Explore. To learn more about the feature, see Budget & Forecast Snapshots: User Guide and the Company level Project Status Snapshots tool. 

New 'Notes' Column for Line Items in Budget and Forecasting Views (5/12/2025)

Teams can now add a Notes column to budget and forecast views. This gives your team essential context about specific line items to improve decision-making. Notes are visible within Procore in views, exports, reports, and snapshots. This feature must be enabled at the Company level by a user with 'Admin' level permissions on the Company Admin tool using Procore Explore or by contacting your Procore point of contact. For details, see About Budget Notes.

Beta  Try Out a New 'Status' Filter for Owner Invoices in Procore's Budget Views (05/12/2025)

Procore invites you to try out a new 'Status' filter that works with the 'Owner Invoice' source column on a budget view, letting budget view users filter budget line items by owner invoice status: Draft, Under Review, Revise & Resubmit, and Approved. To participate in this beta program, contact your Procore point of contact. To learn more, see Set up a New Budget View.

Enabled Workflows Data for Budget Changes for Procore Custom Solutions (05/12/2025)

For teams using custom forms created by Procore Custom Solutions, Procore introduced the capability to enable workflows data for budget changes, streamlining the budget management process by integrating workflow data directly into custom PDF reports. This enhancement improved the accuracy and efficiency of budget tracking and reporting, providing construction stakeholders with a comprehensive view of budget changes and their associated workflows. 

Beta  Budget Code Attributes for Work Breakdown Structure (04/25/2025)

Procore has introduced the ability to create and assign attributes at the budget code level, enhancing flexibility and customization for users. The Budget tool now supports attribute grouping and filtering, as well as budget export capabilities. This program can be enabled by a user with 'Admin' permissions on the Company Admin tool using Procore Explore. If you don't have Procore Explore, contact your Procore point of contact. To learn more, see About Budget Code Attributes.

CONFIGURABLE RED TEXT ON BUDGET LINE ITEMS (11/11/2024)

With this release, a new setting is introduced that allows users to control whether budget line items appear in red when any of their values are negative. This feature provides flexibility for users who prefer not to have line items highlighted in red. When the setting is turned ON, negative values will be displayed in red text on both the budget and PDF, as is currently the case. When the setting is turned OFF, all text will appear in black, except for hyperlinks, regardless of negative values.

View Labor Productivity Tracking with Flexible Work Breakdown Structure (06/17/2024)

You can leverage flexible Work Breakdown Structure (WBS) when budgeting the resource hours and associated cost as well as a production plan based on units to install for production quantities. Flexible WBS allows your team to budget, track time and units installed in Timesheets, and report  at the right level of granularity, for an enhanced real time labor productivity cost Budget View. See Resource Tracking and Project Financials: Setup Guide.

New Configuration Setting for Automatic Change Event Creation (05/13/2024)

A configuration setting has been added to the Budget tool that will allow users the choice to turn off the automatic creation of new change events when budget changes are required to have change event association. When the new setting is turned on, budget change adjustments without a manually selected change event line item association will trigger the automatic creation of a new change event when saved. When it is turned off, budget changes cannot be saved without associating a change event line item to each adjustment.