Project Financials + Procore Edge Connector for Acumatica®

Overview

Procore's Accounting Integrations connect Procore with your ERP or Accounting system, uniting the office and field teams with one source of financial project data.

With Procore Edge for Acumatica®, you can: 

  • Exchange information between systems to provide your project team with access to data from a single source-of-truth.
  • Reduce manual and duplicate data-entry to increase confidence that data is free from unnecessary errors.
  • Improve decision-making with access to the most up-to-date data available.
  • Streamline communication and information-sharing between your back-office and operational teams.

Required Software

The following versions of Procore Edge for Acumatica® Construction Edition are supported:

  • 2024R1
  • 2023R2
  • 2023R1

 

acumatica-2024-stacked-logo.jpg

Availability of ERP connectors is dependent on several factors, including the country or region in which your business operates. To learn whether or not an integration is available in your area, contact your Procore point of contact.

Tutorials

There are no items that match your search query.

Workflows

Job Setup

diagram_erp-acumatica_job-setup.png

diagram_erp-acumatica_job-setup_de-de.png

diagram_erp-acumatica_job-setup_en-au.png

diagram_erp-acumatica_job-setup_en-ca.png

diagram_erp-acumatica_job-setup_en-gb.png

diagram_erp-acumatica_job-setup_es-es.png

diagram_erp-acumatica_job-setup_es-la.png

diagram_erp-acumatica_job-setup_fr-ca.png

diagram_erp-acumatica_job-setup_fr-fr.png

diagram_erp-acumatica_job-setup_ja-jp.png

diagram_erp-acumatica_job-setup_pt-br.png

diagram_erp-acumatica_job-setup_zh-sg.png

diagram_erp-acumatica_job-setup.png

Sub Job Setup

diagram_erp-generic_sub-job-setup.png

diagram_erp-generic_sub-job-setup_de-de.png

diagram_erp-generic_sub-job-setup_en-au.png

diagram_erp-generic_sub-job-setup_en-ca.png

diagram_erp-generic_sub-job-setup_en-gb.png

diagram_erp-generic_sub-job-setup_es-es.png

diagram_erp-generic_sub-job-setup_es-la.png

diagram_erp-generic_sub-job-setup_fr-ca.png

diagram_erp-generic_sub-job-setup_fr-fr.png

diagram_erp-generic_sub-job-setup_ja-jp.png

diagram_erp-generic_sub-job-setup_pt-br.png

diagram_erp-generic_sub-job-setup_zh-sg.png

diagram_erp-generic_sub-job-setup.png

Budget Setup

diagram_erp-generic_budget-setup.png

diagram_erp-generic_budget-setup_de-de.png

diagram_erp-generic_budget-setup_en-au.png

diagram_erp-generic_budget-setup_en-ca.png

diagram_erp-generic_budget-setup_en-gb.png

diagram_erp-generic_budget-setup_es-es.png

diagram_erp-generic_budget-setup_es-la.png

diagram_erp-generic_budget-setup_fr-ca.png

diagram_erp-generic_budget-setup_fr-fr.png

diagram_erp-generic_budget-setup_ja-jp.png

diagram_erp-generic_budget-setup_pt-br.png

diagram_erp-generic_budget-setup_zh-sg.png

diagram_erp-generic_budget-setup.png

Budget Update

diagram_erp-generic_budget-updates.png

diagram_erp-generic_budget-updates_de-de.png

diagram_erp-generic_budget-updates_en-au.png

diagram_erp-generic_budget-updates_en-ca.png

diagram_erp-generic_budget-updates_en-gb.png

diagram_erp-generic_budget-updates_es-es.png

diagram_erp-generic_budget-updates_es-la.png

diagram_erp-generic_budget-updates_fr-ca.png

diagram_erp-generic_budget-updates_fr-fr.png

diagram_erp-generic_budget-updates_ja-jp.png

diagram_erp-generic_budget-updates_pt-br.png

diagram_erp-generic_budget-updates_zh-sg.png

diagram_erp-generic_budget-updates.png

Create and Export Commitments

diagram_erp-generic_create-and-export-commitments.png

diagram_erp-generic_create-and-export-commitments_de-de.png

diagram_erp-generic_create-and-export-commitments_en-au.png

diagram_erp-generic_create-and-export-commitments_en-ca.png

diagram_erp-generic_create-and-export-commitments_en-gb.png

diagram_erp-generic_create-and-export-commitments_es-es.png

diagram_erp-generic_create-and-export-commitments_es-la.png

diagram_erp-generic_create-and-export-commitments_fr-ca.png

diagram_erp-generic_create-and-export-commitments_fr-fr.png

diagram_erp-generic_create-and-export-commitments_ja-jp.png

diagram_erp-generic_create-and-export-commitments_pt-br.png

diagram_erp-generic_create-and-export-commitments_zh-sg.png

diagram_erp-generic_create-and-export-commitments.png

Create and Export CCOs

diagram_erp-generic_create-and-export-commitment-change-orders.png

diagram_erp-generic_create-and-export-commitment-change-orders_de-de.png

diagram_erp-generic_create-and-export-commitment-change-orders_en-au.png

diagram_erp-generic_create-and-export-commitment-change-orders_en-ca.png

diagram_erp-generic_create-and-export-commitment-change-orders_en-gb.png

diagram_erp-generic_create-and-export-commitment-change-orders_es-es.png

diagram_erp-generic_create-and-export-commitment-change-orders_es-la.png

diagram_erp-generic_create-and-export-commitment-change-orders_fr-ca.png

diagram_erp-generic_create-and-export-commitment-change-orders_fr-fr.png

diagram_erp-generic_create-and-export-commitment-change-orders_ja-jp.png

diagram_erp-generic_create-and-export-commitment-change-orders_pt-br.png

diagram_erp-generic_create-and-export-commitment-change-orders_zh-sg.png

diagram_erp-generic_create-and-export-commitment-change-orders.png

Create and Sync Vendors

diagram_erp-generic_create-and-sync-vendors.png

diagram_erp-generic_create-and-sync-vendors_de-de.png

diagram_erp-generic_create-and-sync-vendors_en-au.png

diagram_erp-generic_create-and-sync-vendors_en-ca.png

diagram_erp-generic_create-and-sync-vendors_en-gb.png

diagram_erp-generic_create-and-sync-vendors_es-es.png

diagram_erp-generic_create-and-sync-vendors_es-la.png

diagram_erp-generic_create-and-sync-vendors_fr-ca.png

diagram_erp-generic_create-and-sync-vendors_fr-fr.png

diagram_erp-generic_create-and-sync-vendors_ja-jp.png

diagram_erp-generic_create-and-sync-vendors_pt-br.png

diagram_erp-generic_create-and-sync-vendors_zh-sg.png

diagram_erp-generic_create-and-sync-vendors.png

Export Subcontractor Invoices

diagram_erp-generic_create-and-export-subcontractor-invoices.png

diagram_erp-generic_create-and-export-subcontractor-invoices_de-de.png

diagram_erp-generic_create-and-export-subcontractor-invoices_en-au.png

diagram_erp-generic_create-and-export-subcontractor-invoices_en-ca.png

diagram_erp-generic_create-and-export-subcontractor-invoices_en-gb.png

diagram_erp-generic_create-and-export-subcontractor-invoices_es-es.png

diagram_erp-generic_create-and-export-subcontractor-invoices_es-la.png

diagram_erp-generic_create-and-export-subcontractor-invoices_fr-ca.png

diagram_erp-generic_create-and-export-subcontractor-invoices_fr-fr.png

diagram_erp-generic_create-and-export-subcontractor-invoices_ja-jp.png

diagram_erp-generic_create-and-export-subcontractor-invoices_pt-br.png

diagram_erp-generic_create-and-export-subcontractor-invoices_zh-sg.png

diagram_erp-generic_create-and-export-subcontractor-invoices.png

Permissions

Learn which user permissions are required to take the described actions in this tool.

 Important

Some actions that impact this tool are done in other Procore tools. See the User Permissions Matrix for the full list of actions taken in all other tools.

   The action is available on Procore's Web, iOS, and/or Android application. Click to view the tutorial.

icon-mindtouch-table-check.png Users can take the action with this permission level.

icon-mindtouch-table-check.png Users can take this action with this permission level AND one or more additional requirements, like granular permissions.

 Important

Several available actions in the ERP Integrations tool also require Accounting Approver permissions. An Accounting Approver is a user with either 'Standard' or 'Admin' level permissions to the ERP Integrations tool who has been granted the 'Can Push to Accounting' privilege. 

Not all ERP connectors support every action described below. To learn more about your connector's supported functions, see Things to Know About your ERP Integration

Action None Read Only Standard Admin Notes

Accept or Reject Cost Codes for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject Owner Invoices for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject Subcontractor Invoices for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject a Budget for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject a CCO for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject a Commitment for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject a Company for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject a PCCO for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject a Project for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject a Sub Job for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Add a Procore Project to your ERP System

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Add an ERP Company to the Procore Company Directory

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Add an ERP Job to Procore

 Web

      icon-mindtouch-table-check.png  

Archive an ERP Company in Procore

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Assign Default Cost Types To ERP Standard Cost Codes

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Configure Advanced Settings: ERP Integrations

 Web

      icon-mindtouch-table-check.png  

Configure the Sync Schedule for your ERP Integration

 Web

      icon-mindtouch-table-check.png  

Enable or Disable ERP Direct Exports

 Web

      icon-mindtouch-table-check.png  

Import a Budget from ERP

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Import a Prime Contract from an Integrated ERP System into Procore

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Import an ERP Sub Job to a Procore Project

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Link ERP Companies to Procore Companies

 Web

      icon-mindtouch-table-check.png  

Refresh the Companies List for ERP

 Web

      icon-mindtouch-table-check.png  

Refresh the Cost Codes on an ERP Integrated Project

 Web

      icon-mindtouch-table-check.png  

Send, Retrieve, or Resend Items to ERP Integrations for Accounting Acceptance

 Web

       
  • These actions do NOT require permissions to the ERP Integrations tool.
  • Sending items to ERP for accounting acceptance requires 'Admin' level permissions on the tool where the item is located. 

Sync Job Cost Transactions from an Integrated ERP into Procore

 Web

      icon-mindtouch-table-check.png  

Sync Paid Invoice Notifications from ERP into Procore

 Web

      icon-mindtouch-table-check.png  

Unlink CCOs Synced with ERP

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Unlink Commitments Synced with ERP

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Unlink Owner Invoices Synced with ERP

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Unlink PCCOs Synced with ERP

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Unlink Subcontractor Invoices Synced with ERP

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Unlink a Company Synced with ERP

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

View a List of Synced Sub Jobs

 Web

   

icon-mindtouch-table-check.png

  • Requires additional tool permissions 

icon-mindtouch-table-check.png

  • Requires additional tool permissions 

Also requires 'Admin' level permissions to the Company level Directory tool, or 'Standard' level permissions with the 'Create New Project' granular permission.

View an Accountant Report for ERP

 Web

      icon-mindtouch-table-check.png  

View an ERP Job Costs Report

 Web

     

icon-mindtouch-table-check.png

  • Requires additional tool permissions to view at the project level

'Admin' level permissions to the ERP Integrations tool allows users to view this report at the Company level. 

To view at the Project level, users also require:

  • 'Read-only' level permission or above on the project's Reports tool.
    AND
    • 'Admin' level permission on the project's Budgets tool.
      OR
    • 'Admin' level permission on the project's Prime Contract tool.

View an ERP Unsyncable Direct Costs Report

 Web

       

Users do NOT require permissions to the ERP Integrations tool to view this report. They do require:

  • 'Read-only' level permission and above on the project's Reports tool
    AND
    • 'Admin' level permission on the project's Budgets tool
      OR
    • 'Admin' level permission on the project's Prime Contract tool.

View the Archived Companies List for ERP

 Web

   

icon-mindtouch-table-check.png

icon-mindtouch-table-check.png

 

 

 

Release Notes

Below are the notable changes to the Procore + Acumatica® integration.

Recent Changes

ERP Enhancement to Budget Syncing Functionality (02/03/2025)

Procore has automated the export process for project cost codes, eliminating the need for manual refreshes before exporting financial objects. The new functionality now ensures that any new cost codes are automatically refreshed and exported, streamlining the workflow for users connected to ERP systems. This new functionality applies to ERP integrations that allow cost code/WBS code syncing and project exports. See Things to Know about Procore Edge Connector for Acumatica® ERP Connector to learn more.

New! retainage release on subcontractor invoices with the Acumatica® Connector (05/08/2023)

Users can now release retainage on subcontract invoices in Procore and export the released retainage to Acumatica®. This feature will be automatically enabled on all integrated projects. To learn more about this feature, see Send Subcontractor Invoices to ERP Integrations for Accounting Acceptance.

New! Prime Contracts and Prime Contract Change order (PCCO) syncing with the Acumatica® Connector (05/08/2023)

Users can now sync their Prime Contracts to Acumatica® as a single, summarized line item in the Revenue Budget tab. Prime Contract syncing is automatic and requires no action to initiate once a contract has been created and approved in Procore. To learn more about this feature, see How do I sync my Prime Contract with Acumatica?

Users can also sync PCCOs from Procore to Acumatica®. To enable PCCO syncing on an integrated project, please contact your Acumatica® channel partner and request that they upgrade you to the latest Procore Customization Package. For more information, reach out to your Procore point of contact.

Things to Know

Background

Each of Procore's available ERP connectors perform the basic function of syncing data between the ERP system and Procore, usually in the same way as other connectors. However, each connector has a unique set of items it can sync, and the way those items are synced will vary based on how that ERP system and its corresponding integration are built to function. 

Procore Edge for Acumatica®, like all ERP integrations, has some key considerations, limitations, and things to know about how each Procore object is synced. Those considerations, limitations, and things to know are outlined in the table below according to tool or item being synced.

Availability of ERP connectors is dependent on several factors, including the country or region in which your business operates. To learn whether or not an integration is available in your area, contact your Procore point of contact.

Things to know about the Procore Edge for Acumatica® Connector

Procore Item or Setting

Considerations, Limitations, and Requirements

configuration settings

  • Default Project Template
    If you have created a project template in the Porfolio tool, you can select that template from this drop-down list. This will apply the template to the Procore project that is created when you import a Procore Edge for Acumatica® job.
  • Use Procore Contract #
    Mark this checkbox if you want Procore to populate the 'Commitment ID' field with the Procore contract number, when your users create a commitment in Procore. (Note: This settings affects only commitments created in Procore. Users also retain the ability to change the Commitment ID in Procore).
  • Use Procore Change Order #
    Mark this checkbox if you want Procore to populate the 'CCO ID' field with the Procore's CCO ID, when your users create a commitment change order in Procore. (Note: This settings affects only CCO's created in Procore and users retain the ability to change the CCO ID in Procore).
  • Automatically add new cost code/cost type combinations and sub job cost code/cost type combinations to budgets on Procore Edge for Acumatica® integrated projects
    Mark this checkbox if you want Procore to automatically add the cost code/category combo as a new budget line item regardless of whether or not the budget is locked or unlocked. If the budget is unlocked, Procore will automatically import the Estimate amount found in Procore Edge for Acumatica® to the Original Budget column. If the budget is locked, Procore will still add the line item for the new cost code/category combination, but will set the Original Budget column to $0 (Note: Original budgeted amounts will not be imported if the budget is locked).
  • Procore's Budget Direct Cost Column
    • Read only, populate from Procore Edge for Acumatica®
      On Acumatica integrated projects, the Budget's 'Direct Cost' column can either be read only and populated with data from Acumatica or editable and not populated from Procore Edge for Acumatica®.
      OR
    • Editable, do not populate from Procore Edge for Acumatica®
      If you're using the Direct Costs tab, the data will always be populated from Procore's Direct Costs Tool.
  • Vendors will be automatically updated
    • This feature is not currently supported by Procore Edge for Acumatica®.

SYNC SCHEDULE

Data Exchange Frequency

  • Exports happen instantly upon approval by your organization’s Accounting User(s). Imports happen upon requests which can be made by your Project and Accounting Teams directly within Procore. In addition to on-demand imports, there is an automatic nightly import of data.

Procore-Managed Auto Sync

  • This feature is not currently supported for the Procore Edge for Acumatica® Integration. Job Cost Syncs and Payments for Synced Subcontract Invoice Syncs do run a daily, automatic sync process. This daily sync is configured in the integrations microservice by default.

COMPANY LEVEL work breakdown structure (wbs)

Considerations

  • When the integration goes live, the Procore Edge for Acumatica® standard cost code list is automatically imported to Procore, as a separate list than your Procore standard cost code list. This is the company level cost code list to be used on new projects. This list is managed in Procore Edge for Acumatica®'s Cost Code page, form PM209500.
  • To add a new cost code to the Procore Edge for Acumatica® synced company level cost code list in Procore, simply add it to Procore Edge for Acumatica®, Cost Code page, form PM209500. Then sync the new cost codes with Procore's 'Procore Edge for Acumatica® Standard Cost Codes' list in the Company level Admin tool.

Limitations

  • Cost codes that import from Procore Edge for Acumatica® will display in Procore as Division, followed by Cost Code. For example, cost code 10600.000, within division 10, will appear as "10-10600.000".

PROJECT LEVEL work breakdown structure (wbs)

Limitations

  • Procore Edge for Acumatica® does not support project specific cost codes. All project level cost codes must originate from the ERP synced Procore Edge for Acumatica® standard cost code list.
  • Any project level cost codes that are not synced will automatically sync with your ERP when exporting your budget.

companies

Limitations

  • The Company/Vendor insurance is not included when importing/exporting a Company/Vendor, as that field is not within the Procore Edge for Acumatica® AP Vendor data table. This information is in a different data table in Procore Edge for Acumatica® that is not a part of this integration.

Considerations

  • The ERP Vendor ID is entered manually by an Accounting Approver when a Company is exported from Procore to Procore Edge for Acumatica®. This is stored as the ERP Vendor ID (you can view it in the ERP Integrations tool, under Companies, or in the company-level Directory tool) and is then used on other vendor related exports (Commitments, Commitment CO’s).
    • Note: This can be an optional field during exporting if this option has been enabled by Procore.

Additional Information

  • It's strongly recommended that you first try to link any Procore Edge for Acumatica® vendors that already exist in your Procore account's Company level Directory before adding vendors from Procore Edge for Acumatica®.

projects

Limitations

  • Projects that are in-progress or created before connection of the integration cannot be synced. Professional Services for assistance with integrating in-progress/pre-existing project records are available for an additional fee.

Project Export Requirements

  • All cost codes must have at least one (1) cost type  assignment before the Procore project can be exported to create a new Job in Procore Edge for Acumatica®.
  • If your cost codes already have cost type assignments, your company has already configured the cost type assignments for your cost codes. 
  • The ERP Job ID must be defined during export. Procore Edge for Acumatica® only allows numeric characters, with no separators.
    • Note: If auto-numbering is enabled in Procore Edge for Acumatica®, the Job ID defined in Procore will be overwritten in Procore Edge for Acumatica® with the next id in the defined Procore Edge for Acumatica® sequence. If the project is imported from Procore Edge for Acumatica®, the project ID will automatically populate in the project number field.   
  • When entering your project data, be aware of the following requirements:
    • Project Name. Procore Edge for Acumatica® imposes a maximum of thirty (30) characters limit. If your project name exceeds this limit, your project name will be truncated in Procore Edge for Acumatica®.
    • Project Address. Procore Edge for Acumatica® does not permit the use of commas (,) in the 'Project Address' field. 
    • Active Project. Procore Edge for Acumatica® requires you to set your new project is 'Active' in Procore. 

Considerations

  • When a project is exported from Procore to Procore Edge for Acumatica® it is separate from the export of a project's budget. Cost codes on the Procore project WBS will create synced data in the background of the connector, but will not populate any budget lines to the Procore Edge for Acumatica® project's Cost Budget tab.
  • When a project is imported from Procore Edge for Acumatica® to Procore, it is also separate from the import of a project's budget. Imported projects will not have WBS codes defined after import, and will require additional steps to add and sync cost codes in accordance with your defined workflow training.

SUB JOBS

Limitations

  • Sub Jobs are not a required segment on your Procore projects, while at least one of the Procore Edge for Acumatica® equivalent (Project Tasks) is required.  Due to this, when projects are synced with the integration,  a Project Task is created in the project's Procore Edge for Acumatica® Task tab by default. This default Project Task will be directly tied to the parent project Cost Code WBS segment in Procore. In Procore Edge for Acumatica®, this task will have the same ID as the project, and have a description of "Procore Integration Task (do not edit or delete). 
    • Note: Due to this feature's flexibility, there are several different workflows that are available , and it is highly recommended that you define and adhere to a standard operating procedure for how your projects will use project tasks and sub jobs.

Prerequisites

  • Parent project must already be synced to be able to import Project Tasks from Procore Edge for Acumatica®, which will create Sub Jobs in Procore. This also applies if exporting Sub Jobs from Procore to create Project Tasks in Procore Edge for Acumatica®.
  • If do not have a Sub Jobs tab within your Procore ERP Integrations Tool, a backend feature must be enabled on your company's Procore account. To submit a request to enable this feature, contact your Procore point of contact.

Considerations

  • Cost codes and cost types that are assigned to a Sub Job must not also be assigned to the Procore project's parent Cost Code segment. The same cost codes should not be synced across multiple WBS segments.
  • The deafult Project Task created by the integration should always have the "Empty Sub Job" box checked.
  • To add an Procore Edge for Acumatica® 'Project Task' as a Procore 'Sub Job',   ensure that the "Empty Sub Job" box next to that Project Task in Procore Edge for Acumatica®'s Task tab is left unchecked. This will permit your Project Task to appear in the Procore Sub Job tab's "Ready to Import" filter. If the box is checked, it will not be importable to Procore.
  • You cannot delete a Sub Job if there are cost codes tied to that Sub Job.
  • Deleting or altering a Project Task or Task ID in Procore Edge for Acumatica® will not delete or un-sync its Sub Job equivalent in Procore.

BUDGET

Prerequisites for Export from Procore

  • The Budget tool must be an active tool on the project.
  • The budget must be locked before the export.
  • Ensure the project's cost codes are updated with the synced job in Procore Edge for Acumatica®.

Limitations

  • After exporting a budget from Procore to Procore Edge for Acumatica®, the import function (i.e., from Procore Edge for Acumatica® to Procore) will no longer be available for that job/budget.
  • The Procore + Procore Edge for Acumatica® does NOT sync 'Unit of Measure (UOM)' and 'Unit Qty' values between systems. Currently, the Budget sync is amount-based only.
  • When a Procore budget is exported to Procore Edge for Acumatica®, the cost budget lines in Procore Edge for Acumatica® inherit a Project Task ID association. Changing that Task ID line association in Procore Edge for Acumatica® will not update the association information within the integration. If the Task ID value is not what was intended, it signifies that the cost code(s) were not synced in the manner laid out in your Project and Sub Job workflow training.   

BUDGET CHANGES

Considerations

  • Budget Changes are an export only feature, from Procore to Procore Edge for Acumatica®. They must be created in Procore, in order to export and sync with Procore Edge for Acumatica®.

Limitations:

  • After exporting a Procore budget (budget change) to Procore Edge for Acumatica®, you no longer be permitted to import Procore Edge for Acumatica® budget or job data into Procore.

COMMITMENTS

Considerations

  • When a Subcontract is exported from Procore, a Subcontract is created in Procore Edge for Acumatica® (SC301000). 
  • When a Purchase Order is exported from Procore, a Purchase Order is created in Procore Edge for Acumatica® (PO301000).
  • In Procore, Commitments are accessed from the project-level Commitments tool.

Limitations

  • Important! - Export from Procore only. Commitments must always be created in Procore, in order to sync with Procore Edge for Acumatica®. Do NOT create commitments directly in Procore Edge for Acumatica®, as they cannot be imported to Procore.
  • The maximum character length for a commitment's title is 60. This is the maximum number of characters allowed by Procore Edge for Acumatica®.
  • The maximum character length for a commitment's number is 15. This is the maximum number of characters allowed by Procore Edge for Acumatica®.

Commitment change orders

Considerations

  • When a Subcontract Change Order  or Purchase Order Change Order is exported to Procore Edge for Acumatica®, the export will also update the Budget Amount in Procore Edge for Acumatica® (PM308000 > Reference Number > Cost Budget and Commitments tabs). 
  • When creating a  CCO in Procore, you will be required to set CCO SOV lines to either create a new contract SOV line, or update an existing contract SOV line.  When exported to Procore Edge for Acumatica®, the original contract will reflect the SOV setting(s) you elected in Procore.

Limitations

  • Important! - Export from Procore only. Commitment Change Orders must always be created in Procore, in order to sync with Procore Edge for Acumatica®. Do NOT create commitment change orders directly in Procore Edge for Acumatica®, as they cannot be imported to Procore.
  • To add a Schedule of Values (SOV) line item to a CCO, it must be tied to an existing  cost code and category.

subcontractor invoices

Prerequisites

  • To be able to successfully export Subcontractor Invoices from Procore, each AP vendor in Procore Edge for Acumatica® must be set up with a default AP Account, Cash Discount, AP Sub , and Discount Sub accounts (AP303000 > Vendor > GL Accounts tab). 

  • Each vendor in Procore Edge for Acumatica® must also must be set up with a default Cash Account (AP303000 > Vendor > Payment tab). 

  • Each job must also have a default location ID populated in Procore Edge for Acumatica® (AP303000 > Vendor > Location tab). 

Considerations

  • Important! - Export from Procore only. Subcontractor Invoices must always be created in Procore, in order to sync with Procore Edge for Acumatica®. If you create the subcontractor invoice in Procore Edge for Acumatica®, the invoice and its detail will remain in Procore Edge for Acumatica®, and not sync to Procore. 
  • If Auto Numbering for Bills is enabled in Procore Edge for Acumatica®, the Reference Number in Procore Edge for Acumatica® will be the next system generated number

Limitations

  • Subcontractor Invoice payment information recorded in Procore Edge for Acumatica® will only appear on the Procore Commitment if the invoice was synced with  Procore Edge for Acumatica®.

PRIME CONTRACTS

Prerequisites & Limitations
 

Prime contracts in Procore automatically sync to Procore Edge for Acumatica® as a summarized single line item within the Revenue Budget tab. Your prime contract is automatically synced when the following conditions are met:

  • The project is synced with Procore Edge for Acumatica®.
  • A prime contract exists in the 'Approved' status.
  • At least one (1) line item with a non-zero value has been added to the contract's schedule of values (SOV).
  • The contract number must consist of no more than seven (7) alphanumeric characters.

Any changes made to the overall value of the contract after the initial contract value is synced must be manually updated in the ERP system. 

Requirements

In order to sync a Prime Contract with the Acumatica ERP Connector, the 'Revenue Budget Level' setting on the ERP Job’s 'Summary' tab must be set to 'Task' only.

Prime Contract Change Orders

Prerequisites for Export from Procore

  • The Change Order tool must be an active tool on the project.

  • The Procore Project Prime Contract must be approved and exported to the Acumatica® Projects' Revenue Budget.

  • If the synced Prime Contract is using a vertical markup, the markup(s) must have a budget code assigned to the required 'ERP Prime Contract Item' field.

Limitations

  • Important! - Export from Procore only. Prime Contract Change Orders must always be created in Procore, in order to sync with Acumatica®. Do NOT create prime contract change orders directly in Acumatica®, as they cannot be imported to Procore.

Considerations

  • When a PCCO is exported to Acumatica®, it will update the project's Cost and Revenue Budget. The Revenue Budget will have one summarized line for the total expected revenue value of the change.

  • A unique Acumatica Task ID will be created for each synced PCCO, and will be used on the Revenue Budget line. However, Cost Budget lines tied to the PCCO will use the existing Task ID(s) on the Cost Budget for each Budget Code on the PCCO Schedule of Values.

Requirements

In order to sync a PCCO with the Acumatica ERP Connector, the 'Revenue Budget Level' setting on the ERP Job’s 'Summary' tab must be set to 'Task' only.

job COSTS

Prerequisites

  • Procore requires the Procore Edge for Acumatica® Job Cost module.
  • Project must be synced in order for costs to automatically import from Procore Edge for Acumatica® to Procore.
  • To view the job costs in your budget, please use the ERP Budget View, or ERP Detailed Budget View that was created for you during implementation. This budget view has specific calculated and ERP integration sourced data.

Considerations

  • Costs pulled in from Procore Edge for Acumatica® accumulate as four different amount types in Procore, Subcontract Invoices (Subcontracts and Purchase Orders that have been invoiced), Invoices (invoiced amounts not related to a synced contract), Expenses (Misc. Expenses), and Payroll (Labor costs). The sum of these four amount types equal the Job to Date Cost, while the sum of the latter three types (Invoices, Expenses, Payroll) equal the Direct Cost. These are all are in lump sum form, that accumulate under the project cost code and cost type.
  • Detailed job cost transaction syncing is supported by the integration. To leverage this feature, the Direct Cost tool must be active on the project, and the "Enable Job Cost Transaction Syncing" setting should be enabled on the Project Admin General page.

Limitations

  • Job cost type restricting is not supported by the integration. For example, the integration is not customizable to omit labor costs from syncing into Procore.

Data Mapping

Overview


PROCORE
Exports data from Procore to Procore Edge for Acumatica®  Imports data from Procore Edge for Acumatica® to Procore
Procore Edge for Acumatica®
COMPANIES erp-orange-arrows.png erp-green-arrows.png VENDORS
PROJECTS
SUB JOBS
erp-orange-arrows.png erp-green-arrows.png PROJECTS
PROJECT TASKS
PROJECT WBS CODES 1   erp-green-arrows.png COST CODES
COST TYPES
STANDARD COST CODES
  erp-green-arrows.png ACCOUNT GROUPS
STANDARD COST CODES
BUDGETS
SUB JOB/CUSTOM SEGMENT (TASK) PROJECT COST CODE
PROJECT COST TYPE
erp-orange-arrows.png erp-green-arrows.png COST BUDGETS
PROJECT TASK
COST CODE
ACCOUNT GROUP
BUDGET MODIFICATIONS erp-orange-arrows.png   COST BUDGET CHANGE ORDERS
PRIME CONTRACTS erp-orange-arrows.png   REVENUE BUDGET
PRIME CONTRACT CHANGE ORDERS erp-orange-arrows.png   REVENUE BUDGET CHANGE ORDERS
COMMITMENTS
SUBCONTRACTS & PURCHASE ORDERS
COMMITMENT CHANGE ORDERS (CCOs)
erp-orange-arrows.png   COMMITMENTS
SUBCONTRACTS & PURCHASE ORDERS
COMMITMENT CHANGE ORDERS (CCOs)
SUBCONTRACTOR INVOICES erp-orange-arrows.png   PAYABLES
SUBCONTRACT PAYMENTS ISSUED2
FOR SYNCED SUBCONTRACTOR INVOICES
  erp-green-arrows.png PAID INVOICES
COSTS
DIRECT COST
JTD COST
  erp-green-arrows.png COSTS
TRANSACTIONAL COST BY INVOICE, EXPENSE, PAYROLL, AND SUBCONTRACTOR INVOICE TYPES

1 Custom WBS segments are NOT supported at this time.

Import of subcontractor payment records from Procore Edge for Acumatica® is only supported in US Editions.

Companies/Vendors


PROCORE
Exports data from Procore to Procore Edge for Acumatica®  Imports data from Procore Edge for Acumatica® to Procore
Procore Edge for Acumatica®
ERP Vendor ID1 erp-orange-arrows.png erp-green-arrows.png Vendor ID
Name erp-orange-arrows.png erp-green-arrows.png Account Name
Address
City
State
ZIP
erp-orange-arrows.png erp-green-arrows.png Address Line 1
City
State
Postal Code
Business Phone erp-orange-arrows.png erp-green-arrows.png Business 1 Phone
Email Address erp-orange-arrows.png erp-green-arrows.png Account Email

1Export Note: The ERP Vendor ID is entered manually by an Accounting Approver when a company is exported from Procore to Procore Edge for Acumatica®. This is stored as the ERP Vendor ID (you can view it in the company-level ERP Integration tool under Vendors or in the company-level Directory tool) and is then used on other vendor related exports (Commitments, Commitment CO's). This can be an optional field during exporting if this option has been enabled by Procore.

Projects


PROCORE
Exports data from Procore to Procore Edge for Acumatica®  Imports data from Procore Edge for Acumatica® to Procore
Procore Edge for Acumatica®
Project Number erp-orange-arrows.png erp-green-arrows.png Project ID1
Project Name erp-orange-arrows.png erp-green-arrows.png

Description

Address
City
State
Zip
erp-orange-arrows.png erp-green-arrows.png

Address Line 1
City
State
Postal Code

Latitude / Longitude erp-orange-arrows.png erp-green-arrows.png Latitude / Longitude
Start Date/Completion Date erp-orange-arrows.png erp-green-arrows.png Start Date / End Date
Subaccount ID2 erp-orange-arrows.png   Default Sales Subaccount
Template ID3 erp-orange-arrows.png   Template

1 Export note: The Procore Edge for Acumatica® Project ID is entered manually by an accounting approver when a project is exported from Procore to Procore Edge for Acumatica®. This may, or may not, depending on what the accounting approver has entered, match the Project Number found in Procore under the project-level Admin tool. This is stored as the Procore Edge for Acumatica® Project ID (you can view it in the company-level ERP Integrations tool under the Synced section of Projects) and is then used on other project related exports such as Budgets, commitments etc... Import note: If the project is imported from Procore Edge for Acumatica®, the project ID will automatically populate in the project number field

2 Export note: The Subaccount ID is entered manually by an accounting approver when a project is exported from Procore to Procore Edge for Acumatica®. Its an optional field, only required if the customer has enabled Subaccounts in Procore Edge for Acumatica®. If the project is imported into Procore from Procore Edge for Acumatica®, the Subaccount ID is not stored on the project in Procore.

3 Export note: The Template ID is entered manually by an accounting approver when a project is exported from Procore to Procore Edge for Acumatica®. Its an optional field. If the project is imported into Procore from Procore Edge for Acumatica®, the Template ID is not stored on the project in Procore.

Sub Jobs/Project Task


PROCORE
Exports data from Procore to Procore Edge for Acumatica®  Imports data from Procore Edge for Acumatica® to Procore
Procore Edge for Acumatica®
Code erp-orange-arrows.png erp-green-arrows.png Task ID
Sub Job Name erp-orange-arrows.png erp-green-arrows.png Description
Cost Code
Cost Code
Description
erp-orange-arrows.png erp-green-arrows.png Cost Code1
Cost Code
Description
Cost Type
Cost Type
erp-orange-arrows.png erp-green-arrows.png Account Group1
Account Group

 

1 Import note: If the Project Task in Procore Edge for Acumatica® has cost codes and account groups define on the cost budget tab, then those cost codes and account groups will import along with the Project Task. If there are no cost codes or account groups defined on the cost budget, just the project task will import into Procore.

Standard Cost Codes/Cost Codes

In Procore, the Cost Codes can be found in the Work Breakdown Structure (WBS) section in the Admin Tool under Procore Edge for Acumatica® Standard Cost Codes. Custom WBS segments are not supported for the integration at this time.


PROCORE
Exports data from Procore to Procore Edge for Acumatica®  Imports data from Procore Edge for Acumatica® to Procore
Procore Edge for Acumatica®
Cost Code   erp-green-arrows.png Cost Code
Description   erp-green-arrows.png Description

Standard Cost Types/Account Groups

In Procore, the Cost Types can be found in the Cost Types section in the Admin Tool under Procore Edge for Acumatica® Standard Cost Types.


PROCORE
Exports data from Procore to Procore Edge for Acumatica®  Imports data from Procore Edge for Acumatica® to Procore
Procore Edge for Acumatica®
Cost Type   erp-green-arrows.png Account Group
Description   erp-green-arrows.png Description

 

Budgets/Cost Budget

All budgets totals are entered against the Project Task (In Procore Edge for Acumatica®>Project>Cost Budget) or the Sub Job (In Procore>Budget Tool)


PROCORE
Exports data from Procore to Procore Edge for Acumatica®  Imports data from Procore Edge for Acumatica® to Procore
Procore Edge for Acumatica®
Original Budget Amount erp-orange-arrows.png erp-green-arrows.png Original Budgeted Amount
Sub Job erp-orange-arrows.png erp-green-arrows.png Project Task
Cost Code erp-orange-arrows.png erp-green-arrows.png Cost Code
Category erp-orange-arrows.png erp-green-arrows.png Account Group

Budget Modifications

Budget modifications export from Procore only. In Procore, budget mods are accessed from project-level Budget tool.

When Budget Modifications are exported from Procore, a Cost Budget Change Order is created on the Project in Procore Edge for Acumatica®. It will arrive with an "On Hold" status. In Procore, budget modifications are accessed from the Budget Modifications column in the project-level Budget tool. They are used to move money from one budget line item to another, most commonly with a zero net effect.

 Phased Release: Budget Changes

Some ERP integrated clients may have already transitioned from Budget Modifications (Legacy) to the new Budget Changes experience. The legacy experience will continue to be available until November 2024. To learn more about the timeline for migration, see Common Questions.

Choosing to use the new Budget Changes experience will not impact the function of your ERP integration. You should still thoroughly review the available documentation before migrating to the new experience. We recommend you also discuss any concerns or questions about migrating your Budget Modifications to Budget Changes with your Procore point of contact. 

To learn more about the new Budget Changes experience, see About Budget Changes.


PROCORE
Exports data from Procore to Procore Edge for Acumatica®  Imports data from Procore Edge for Acumatica® to Procore
Procore Edge for Acumatica®
Change Date1 erp-orange-arrows.png   Change Date
Sub Job erp-orange-arrows.png   Project Task
Cost Code erp-orange-arrows.png   Cost Code
Cost Type erp-orange-arrows.png   Account Group
Budget Modification Amount erp-orange-arrows.png   Amount

 

1 Export note: The Change Date is entered manually by an accounting approver when the budget mod is exported from Procore to Procore Edge for Acumatica®.

Prime Contracts

Prime Contracts export from Procore only. Prime contracts in Procore automatically sync to Acumatica Cloud ERP as a summarized single line item within the Revenue Budget tab. Your prime contract is automatically synced when the following conditions are met:

  • The project is synced with Procore Edge for Acumatica®.
  • A prime contract exists in the 'Approved' status.
  • At least one (1) line item with a non-zero value has been added to the contract's schedule of values (SOV).
  • The contract number must consist of no more than seven (7) alphanumeric characters.

Any changes made to the overall value of the contract after the initial contract value is synced, must be manually updated in the ERP system. 


PROCORE
Exports data from Procore to Procore Edge for Acumatica®  Imports data from Procore Edge for Acumatica® to Procore
Procore Edge for Acumatica®
Amount
(Schedule of Values tab)
erp-orange-arrows.png   Original Budgeted Amount (Project Revenue Budget)

1 Prime Contract Number can be changed before export in the ERP Integrations tool, resulting in a non-matching number between the corresponding fields. If Auto Numbering is enabled in Procore Edge for Acumatica®, the Prime Contract number in Procore Edge for Acumatica® will be the next system generated number.

Prime Contract Change Orders

Prime Contract Change Orders (PCCOs) export from Procore only. When entering the SOV for a PCCO in Procore, you have the option of selecting an existing line item, or entering a new line item. In Procore, PCCOs are accessed from the project level Prime Contracts tool under Change Orders. In Procore Edge for Acumatica®, the change(s) will appear as a Revenue Change Order with a Status of On Hold


PROCORE
Exports data from Procore to Procore Edge for Acumatica®  Imports data from Procore Edge for Acumatica® to Procore
Procore Edge for Acumatica®
System Date at Time of Prime Contract Creation erp-orange-arrows.png   Change Date
Approval Date
PCCO Number1 erp-orange-arrows.png   Reference Nbr
External ID
Title (General tab) erp-orange-arrows.png   Description
Description (Schedule of Values tab) erp-orange-arrows.png   Description
Project Number
 
erp-orange-arrows.png   Project
 
Sub Job erp-orange-arrows.png   Project Task
Cost Code (Schedule of Values tab) erp-orange-arrows.png   Cost Code (Cost Budget Tab)
Cost Type (Schedule of Values tab) erp-orange-arrows.png   Account Group (Cost Budget Tab)
Potential Change Order Amount erp-orange-arrows.png   Amount (Cost Budget Tab)
Potential Change Order Amount + Markup(s) Amount erp-orange-arrows.png   Amount (Revenue Budget Tab)2

1 PCCO Number can be changed before export in the ERP Integrations tool, resulting in a non-matching number between the corresponding fields. If Auto Numbering for Change Orders is enabled in Procore Edge for Acumatica®, the Change Order number in Procore Edge for Acumatica® will be the next system generated number.

2 Markup Amounts=Gross Margin Amount (except when using Markup to Estimate, then markups are included in Change Total Amount).

 

Commitments

Commitments export from Procore only. When a Commitment (Subcontract or Purchase Order) is exported from Procore, a commitment is automatically created in Procore Edge for Acumatica®. For Subcontracts a status of Open will be used in Procore Edge for Acumatica®. The Project used in Procore will be sent to the Project field on the commitment line item in Procore Edge for Acumatica®. For Purchase Orders, a status of Open will be used in Procore Edge for Acumatica®. For Purchase Orders, the type of Normal will be used in Procore Edge for Acumatica®. In Procore, Commitments are accessed from the project-level Commitments tool. 


PROCORE
Exports data from Procore to Procore Edge for Acumatica®  Imports data from Procore Edge for Acumatica® to Procore
Procore Edge for Acumatica®
System Date at Time of Commitment Creation erp-orange-arrows.png   Date
Start Date (Subcontract)
Delivery Date (Purchase Order)
erp-orange-arrows.png   Start Date (Subcontract)
Promised On (Purchase Order)
Commitment #1 erp-orange-arrows.png   Subcontract Nbr (for Subcontracts)
Order Nbr (for Purchase Orders)
External Ref (Subcontracts and Purchase Orders)
Contract Company erp-orange-arrows.png   Vendor
Title (General tab) erp-orange-arrows.png   Description
Default Retainage erp-orange-arrows.png   Retainage Percent

Budget Code (Schedule of Values tab)

Sub Job
Cost Code
Cost Type

erp-orange-arrows.png   Project Task
Cost Code
Inventory ID2
Description (Schedule of Values tab) erp-orange-arrows.png   Line Description
Qty (Schedule of Values tab), if applicable erp-orange-arrows.png   Order Qty
Unit Cost (Schedule of Values tab), if applicable erp-orange-arrows.png   Unit Cost
Amount
(Schedule of Values tab)
erp-orange-arrows.png   Ext. Cost

1Commitment # can be changed before export in the ERP Integrations tool, resulting in a non-matching number between the corresponding fields. If Auto Numbering for Subcontracts and/or Purchase Orders is enabled in Procore Edge for Acumatica®, the Subcontract/Purchase Order number in Procore Edge for Acumatica® will be the next system generated number.

2The Inventory ID comes from the Account Groups(Cost Type)>Procore Integration>Default Non-Stock setting in Procore Edge for Acumatica®

Commitment Change Orders

Commitment Change Orders export from Procore only. When entering the SOV for a Commitment Change Order in Procore, you have the option of selecting an existing line item, or entering a new line item. In Procore, Commitment Change Orders are accessed from the project level Commitments tool under Commitment Record. In Procore Edge for Acumatica®, the change(s) will appear as a Commitment Change Order with a Status of Closed


PROCORE
Exports data from Procore to Procore Edge for Acumatica®  Imports data from Procore Edge for Acumatica® to Procore
Procore Edge for Acumatica®
System Date at Time of Commitment Creation erp-orange-arrows.png   Change Date
Approval Date
Commitment Change Order #1 erp-orange-arrows.png   Change Order Reference Nbr
External Reference Nbr
Contract Company erp-orange-arrows.png   Vendor
Title (General tab) erp-orange-arrows.png   Description
Description (Schedule of Values tab) erp-orange-arrows.png   Description
Project Number
Sub Job
erp-orange-arrows.png   Project
Project task
Cost Code (Schedule of Values tab) erp-orange-arrows.png   Cost Code
Cost Type (Schedule of Values tab) erp-orange-arrows.png   Inventory ID2
Qty (Schedule of Values tab), if applicable erp-orange-arrows.png   Quantity
Unit Cost (Schedule of Values tab), if applicable erp-orange-arrows.png   Unit Cost
Amount
(Schedule of Values tab)
erp-orange-arrows.png   Amount
Description
(General tab)
erp-orange-arrows.png   Detailed Description

 

1Commitment Change Order # can be changed before export in the ERP Integrations tool, resulting in a non-matching number between the corresponding fields. If Auto Numbering for Change Orders is enabled in Procore Edge for Acumatica®, the Change Order number in Procore Edge for Acumatica® will be the next system generated number.

2The Inventory ID comes from the Account Groups(Cost Type)>Procore Integration>Default Non-Stock setting in Procore Edge for Acumatica®

Job Costs

Job costs import from Procore Edge for Acumatica® only. Cost information is retrieved from Procore Edge for Acumatica® for each Sub Job/Cost Code/Category on Synced projects for use in 2 locations in Procore, the Budget and the Job Costs report. If Job Cost Transaction Syncing is enabled on the Procore Project, cost transaction from Procore Edge for Acumatica® are imported into the Direct Cost tool for each project. This provides transaction detail for the costs displayed in Procore, and if the budget view is configured properly the values of those transactions can be viewed into the Direct Costs or JTD Cost columns for a budget line item. 


PROCORE
Exports data from Procore to Procore Edge for Acumatica®  Imports data from Procore Edge for Acumatica® to Procore
Procore Edge for Acumatica®
DIRECT COST TYPE     DIRECT COST TYPE

Invoice

  erp-green-arrows.png Invoices
Subcontractor Invoice   erp-green-arrows.png Commitment Invoices
Payroll   erp-green-arrows.png Payroll
Expense   erp-green-arrows.png Misc Expenses
DIRECT COST      
Date   erp-green-arrows.png Date
Status   erp-green-arrows.png Automatically set to Approved
Employee   erp-green-arrows.png  
Description   erp-green-arrows.png Description
Vendor   erp-green-arrows.png Vendor (Only for transactions that originate from Accounts Payable)
Invoice #   erp-green-arrows.png Invoice (Only for transactions that originate from Accounts Payable)
Budget Code   erp-green-arrows.png Project Task
Cost Code
Account Group
Qty   erp-green-arrows.png Quantity
Unit Cost   erp-green-arrows.png Unit Rate
Amount   erp-green-arrows.png Amount
BUDGET      
JTD Cost   erp-green-arrows.png Actual Amount
Direct Costs   erp-green-arrows.png JTD Cost - Commitment Invoiced1
JOB COSTS REPORT      
Sub Job   erp-green-arrows.png Project Task
Cost Code   erp-green-arrows.png Cost Code
Cost Type   erp-green-arrows.png Account Group
Original Budget   erp-green-arrows.png Original Budgeted Amount
Original Budget Units   erp-green-arrows.png Original Budgeted Quantity
Approved Budget Changes   erp-green-arrows.png Budgeted CO Amount
Approved Budget Unit Changes   erp-green-arrows.png Budgeted CO Quantity
Revised Budget   erp-green-arrows.png Revised Budgeted Amount
Revised Budget Units   erp-green-arrows.png Revised Budgeted Quantity
Commitment Invoiced   erp-green-arrows.png Committed Invoiced Amount
Job To Date Cost   erp-green-arrows.png Actual Amount

1Direct costs is calculated from Job To Date Cost minus Commitment Invoiced.

Subcontractor Invoices

When a subcontractor invoice is exported from Procore to Procore Edge for Acumatica®, an AP Bill is automatically created in Procore Edge for Acumatica®. In Procore, Subcontractor Invoices are accessed from Invoices in the project Commitments tool. In Procore Edge for Acumatica®, the Bill will have a status of On Hold. NOTE: For customers who have multiple Cash Accounts in Acumatica, Procore will export subcontractor invoices to the Cash Account defined on the Acumatica project>USER-DEFINED FIELDS.


PROCORE
Exports data from Procore to Procore Edge for Acumatica®  Imports data from Procore Edge for Acumatica® to Procore
Procore Edge for Acumatica®
Billing Date erp-orange-arrows.png   Date
Project erp-orange-arrows.png   Project
Commitment # erp-orange-arrows.png   Subcontract Nbr.
Overall Comments erp-orange-arrows.png   Description
Contractor Company erp-orange-arrows.png   Supplier
Invoice #1 erp-orange-arrows.png   Reference Nbr
Supplier Ref
Payment Due erp-orange-arrows.png   Amount
Budget Code (Detail Tab)
Sub Job
Cost Code
Cost Type
erp-orange-arrows.png   Project Task
Cost Code
Inventory ID2
This Period (Detail Tab) erp-orange-arrows.png   Amount

Work Retainage Held %
Work Retainage Held $

Work Retainage Released %

Work Retainage Released $

erp-orange-arrows.png  

Retainage Held Amount
Retainage Held Percent

Retainage Released Amount

Retainage Released Percent

Accounting Date erp-orange-arrows.png  

 

Date

1If Auto Numbering for Bills is enabled in Procore Edge for Acumatica®, the Reference Number in Procore Edge for Acumatica® will be the next system generated number.

2The Inventory ID comes from the Account Groups(Cost Type)>Procore Integration>Default Non-Stock setting in Procore Edge for Acumatica®

Commitment Payments Issued

Commitment Payments Issued imported from Procore Edge for Acumatica® only. When a subcontractor invoice is exported from Procore to Procore Edge for Acumatica®, an AP Bill is automatically created in Procore Edge for Acumatica®. When the AP Bill is paid the payment information will flow back to Procore. In Procore, Subcontractor Invoices Payments are accessed from Payments Issued in the project Commitments tool. In Procore Edge for Acumatica®, payments are accessed from Payables>Checks and Payments.


PROCORE
Exports data from Procore to Procore Edge for Acumatica®  Imports data from Procore Edge for Acumatica® to Procore
Procore Edge for Acumatica®

Invoices

  erp-green-arrows.png n/a
Date   erp-green-arrows.png Post Date
Payment #   erp-green-arrows.png Reference Nbr
Invoice #   erp-green-arrows.png Supplier Ref
Check / Ref #   erp-green-arrows.png Payment Ref
Amount   erp-green-arrows.png Payment Amount