Project Financials + Procore Vision Connector for Acumatica®

Procore's Accounting Integrations connect Procore with your ERP or Accounting system, uniting the office and field teams with one source of financial project data.

With Procore Vision for Acumatica®, you can: 

  • Exchange information between systems to provide your project team with access to data from a single source-of-truth.
  • Reduce manual and duplicate data-entry to increase confidence that data is free from unnecessary errors.
  • Improve decision-making with access to the most up-to-date data available.
  • Streamline communication and information-sharing between your back-office and operational teams.
acumatica-2024-stacked-logo.jpg
 Coming Soon
Procore Vision for Acumatica® Cloud ERP is coming soon in 2025. Please reach out to your Procore point of contact for more information.

Required Software

The following versions of Procore Vision for Acumatica® Construction Edition are supported:

  • 2024R2
  • 2024R1
  • 2023R2

Availability of ERP connectors is dependent on several factors, including the country or region in which your business operates. To learn whether or not an integration is available in your area, contact your Procore point of contact.

There are no items that match your search query.

Job Setup

diagram_erp-acumatica_job-setup.png

diagram_erp-acumatica_job-setup_de-de.png

diagram_erp-acumatica_job-setup_en-au.png

diagram_erp-acumatica_job-setup_en-ca.png

diagram_erp-acumatica_job-setup_en-gb.png

diagram_erp-acumatica_job-setup_es-es.png

diagram_erp-acumatica_job-setup_es-la.png

diagram_erp-acumatica_job-setup_fr-ca.png

diagram_erp-acumatica_job-setup_fr-fr.png

diagram_erp-acumatica_job-setup_ja-jp.png

diagram_erp-acumatica_job-setup_pt-br.png

diagram_erp-acumatica_job-setup_zh-sg.png

diagram_erp-acumatica_job-setup.png

Sub Job Setup

diagram_erp-generic_sub-job-setup.png

diagram_erp-generic_sub-job-setup_de-de.png

diagram_erp-generic_sub-job-setup_en-au.png

diagram_erp-generic_sub-job-setup_en-ca.png

diagram_erp-generic_sub-job-setup_en-gb.png

diagram_erp-generic_sub-job-setup_es-es.png

diagram_erp-generic_sub-job-setup_es-la.png

diagram_erp-generic_sub-job-setup_fr-ca.png

diagram_erp-generic_sub-job-setup_fr-fr.png

diagram_erp-generic_sub-job-setup_ja-jp.png

diagram_erp-generic_sub-job-setup_pt-br.png

diagram_erp-generic_sub-job-setup_zh-sg.png

diagram_erp-generic_sub-job-setup.png

Budget Setup

diagram_erp-generic_budget-setup.png

diagram_erp-generic_budget-setup_de-de.png

diagram_erp-generic_budget-setup_en-au.png

diagram_erp-generic_budget-setup_en-ca.png

diagram_erp-generic_budget-setup_en-gb.png

diagram_erp-generic_budget-setup_es-es.png

diagram_erp-generic_budget-setup_es-la.png

diagram_erp-generic_budget-setup_fr-ca.png

diagram_erp-generic_budget-setup_fr-fr.png

diagram_erp-generic_budget-setup_ja-jp.png

diagram_erp-generic_budget-setup_pt-br.png

diagram_erp-generic_budget-setup_zh-sg.png

diagram_erp-generic_budget-setup.png

Budget Update

diagram_erp-generic_budget-updates.png

diagram_erp-generic_budget-updates_de-de.png

diagram_erp-generic_budget-updates_en-au.png

diagram_erp-generic_budget-updates_en-ca.png

diagram_erp-generic_budget-updates_en-gb.png

diagram_erp-generic_budget-updates_es-es.png

diagram_erp-generic_budget-updates_es-la.png

diagram_erp-generic_budget-updates_fr-ca.png

diagram_erp-generic_budget-updates_fr-fr.png

diagram_erp-generic_budget-updates_ja-jp.png

diagram_erp-generic_budget-updates_pt-br.png

diagram_erp-generic_budget-updates_zh-sg.png

diagram_erp-generic_budget-updates.png

Create and Export Commitments

diagram_erp-generic_create-and-export-commitments.png

diagram_erp-generic_create-and-export-commitments_de-de.png

diagram_erp-generic_create-and-export-commitments_en-au.png

diagram_erp-generic_create-and-export-commitments_en-ca.png

diagram_erp-generic_create-and-export-commitments_en-gb.png

diagram_erp-generic_create-and-export-commitments_es-es.png

diagram_erp-generic_create-and-export-commitments_es-la.png

diagram_erp-generic_create-and-export-commitments_fr-ca.png

diagram_erp-generic_create-and-export-commitments_fr-fr.png

diagram_erp-generic_create-and-export-commitments_ja-jp.png

diagram_erp-generic_create-and-export-commitments_pt-br.png

diagram_erp-generic_create-and-export-commitments_zh-sg.png

diagram_erp-generic_create-and-export-commitments.png

Create and Export CCOs

diagram_erp-generic_create-and-export-commitment-change-orders.png

diagram_erp-generic_create-and-export-commitment-change-orders_de-de.png

diagram_erp-generic_create-and-export-commitment-change-orders_en-au.png

diagram_erp-generic_create-and-export-commitment-change-orders_en-ca.png

diagram_erp-generic_create-and-export-commitment-change-orders_en-gb.png

diagram_erp-generic_create-and-export-commitment-change-orders_es-es.png

diagram_erp-generic_create-and-export-commitment-change-orders_es-la.png

diagram_erp-generic_create-and-export-commitment-change-orders_fr-ca.png

diagram_erp-generic_create-and-export-commitment-change-orders_fr-fr.png

diagram_erp-generic_create-and-export-commitment-change-orders_ja-jp.png

diagram_erp-generic_create-and-export-commitment-change-orders_pt-br.png

diagram_erp-generic_create-and-export-commitment-change-orders_zh-sg.png

diagram_erp-generic_create-and-export-commitment-change-orders.png

Create and Sync Vendors

diagram_erp-generic_create-and-sync-vendors.png

diagram_erp-generic_create-and-sync-vendors_de-de.png

diagram_erp-generic_create-and-sync-vendors_en-au.png

diagram_erp-generic_create-and-sync-vendors_en-ca.png

diagram_erp-generic_create-and-sync-vendors_en-gb.png

diagram_erp-generic_create-and-sync-vendors_es-es.png

diagram_erp-generic_create-and-sync-vendors_es-la.png

diagram_erp-generic_create-and-sync-vendors_fr-ca.png

diagram_erp-generic_create-and-sync-vendors_fr-fr.png

diagram_erp-generic_create-and-sync-vendors_ja-jp.png

diagram_erp-generic_create-and-sync-vendors_pt-br.png

diagram_erp-generic_create-and-sync-vendors_zh-sg.png

diagram_erp-generic_create-and-sync-vendors.png

Export Subcontractor Invoices

diagram_erp-generic_create-and-export-subcontractor-invoices.png

diagram_erp-generic_create-and-export-subcontractor-invoices_de-de.png

diagram_erp-generic_create-and-export-subcontractor-invoices_en-au.png

diagram_erp-generic_create-and-export-subcontractor-invoices_en-ca.png

diagram_erp-generic_create-and-export-subcontractor-invoices_en-gb.png

diagram_erp-generic_create-and-export-subcontractor-invoices_es-es.png

diagram_erp-generic_create-and-export-subcontractor-invoices_es-la.png

diagram_erp-generic_create-and-export-subcontractor-invoices_fr-ca.png

diagram_erp-generic_create-and-export-subcontractor-invoices_fr-fr.png

diagram_erp-generic_create-and-export-subcontractor-invoices_ja-jp.png

diagram_erp-generic_create-and-export-subcontractor-invoices_pt-br.png

diagram_erp-generic_create-and-export-subcontractor-invoices_zh-sg.png

diagram_erp-generic_create-and-export-subcontractor-invoices.png

Learn which user permissions are required to take the described actions in this tool.

 Important

Some actions that impact this tool are done in other Procore tools. See the User Permissions Matrix for the full list of actions taken in all other tools.

   The action is available on Procore's Web, iOS, and/or Android application. Click to view the tutorial.

icon-mindtouch-table-check.png Users can take the action with this permission level.

icon-mindtouch-table-check.png Users can take this action with this permission level AND one or more additional requirements, like granular permissions.

 Important

Several available actions in the ERP Integrations tool also require Accounting Approver permissions. An Accounting Approver is a user with either 'Standard' or 'Admin' level permissions to the ERP Integrations tool who has been granted the 'Can Push to Accounting' privilege. 

Not all ERP connectors support every action described below. To learn more about your connector's supported functions, see Things to Know About your ERP Integration

Action None Read Only Standard Admin Notes

Accept or Reject Cost Codes for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject Owner Invoices for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject Subcontractor Invoices for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject a Budget for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject a CCO for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject a Commitment for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject a Company for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject a PCCO for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject a Project for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Accept or Reject a Sub Job for Export to ERP

 Web

     

icon-mindtouch-table-check.png

 

Add a Procore Project to your ERP System

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Add an ERP Company to the Procore Company Directory

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Add an ERP Job to Procore

 Web

      icon-mindtouch-table-check.png  

Archive an ERP Company in Procore

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Assign Default Cost Types To ERP Standard Cost Codes

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Configure Advanced Settings: ERP Integrations

 Web

      icon-mindtouch-table-check.png  

Configure the Sync Schedule for your ERP Integration

 Web

      icon-mindtouch-table-check.png  

Enable or Disable ERP Direct Exports

 Web

      icon-mindtouch-table-check.png  

Import a Budget from ERP

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Import a Prime Contract from an Integrated ERP System into Procore

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Import an ERP Sub Job to a Procore Project

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Link ERP Companies to Procore Companies

 Web

      icon-mindtouch-table-check.png  

Refresh the Companies List for ERP

 Web

      icon-mindtouch-table-check.png  

Refresh the Cost Codes on an ERP Integrated Project

 Web

      icon-mindtouch-table-check.png  

Send, Retrieve, or Resend Items to ERP Integrations for Accounting Acceptance

 Web

       
  • These actions do NOT require permissions to the ERP Integrations tool.
  • Sending items to ERP for accounting acceptance requires 'Admin' level permissions on the tool where the item is located. 

Sync Job Cost Transactions from an Integrated ERP into Procore

 Web

      icon-mindtouch-table-check.png  

Sync Paid Invoice Notifications from ERP into Procore

 Web

      icon-mindtouch-table-check.png  

Unlink CCOs Synced with ERP

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Unlink Commitments Synced with ERP

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Unlink Owner Invoices Synced with ERP

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Unlink PCCOs Synced with ERP

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Unlink Subcontractor Invoices Synced with ERP

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

Unlink a Company Synced with ERP

 Web

    icon-mindtouch-table-check.png icon-mindtouch-table-check.png  

View a List of Synced Sub Jobs

 Web

   

icon-mindtouch-table-check.png

  • Requires additional tool permissions 

icon-mindtouch-table-check.png

  • Requires additional tool permissions 

Also requires 'Admin' level permissions to the Company level Directory tool, or 'Standard' level permissions with the 'Create New Project' granular permission.

View an Accountant Report for ERP

 Web

      icon-mindtouch-table-check.png  

View an ERP Job Costs Report

 Web

     

icon-mindtouch-table-check.png

  • Requires additional tool permissions to view at the project level

'Admin' level permissions to the ERP Integrations tool allows users to view this report at the Company level. 

To view at the Project level, users also require:

  • 'Read-only' level permission or above on the project's Reports tool.
    AND
    • 'Admin' level permission on the project's Budgets tool.
      OR
    • 'Admin' level permission on the project's Prime Contract tool.

View an ERP Unsyncable Direct Costs Report

 Web

       

Users do NOT require permissions to the ERP Integrations tool to view this report. They do require:

  • 'Read-only' level permission and above on the project's Reports tool
    AND
    • 'Admin' level permission on the project's Budgets tool
      OR
    • 'Admin' level permission on the project's Prime Contract tool.

View the Archived Companies List for ERP

 Web

   

icon-mindtouch-table-check.png

icon-mindtouch-table-check.png

 

 

 

 PROCORE SUPPORT: INTERNAL NOTES

Author note: Make sure to apply the Do Not Translate code so the Payments area is hidden from localization. 

 Coming Soon
Procore Vision for Acumatica® Cloud ERP is coming soon in 2025. Please reach out to your Procore point of contact for more information.

Background

Each of Procore's available ERP connectors perform the basic function of syncing data between the ERP system and Procore, usually in the same way as other connectors. However, each connector has a unique set of items it can sync, and the way those items are synced will vary based on how that ERP system and its corresponding integration are built to function. 

Procore Vision for Acumatica®, like all ERP integrations, has some key considerations, limitations, and things to know about how each Procore object is synced. Those considerations, limitations, and things to know are outlined in the table below according to tool or item being synced.

Availability of ERP connectors is dependent on several factors, including the country or region in which your business operates. To learn whether or not an integration is available in your area, contact your Procore point of contact.

Things to Know about the Procore Vision for Acumatica® 

Procore Item or Setting

Considerations, Limitations, and Requirements

configuration settings

  • Default Project Template
    If you have created a project template in the Portfolio tool, you can select that template from this drop-down list. This will apply the template to the Procore project that is created when you import a Procore Vision for Acumatica® job.
  • Use Procore Contract #
    Mark this checkbox if you want Procore to populate the 'Commitment ID' field with the Procore contract number, when your users create a commitment in Procore. (Note: This settings affects only commitments created in Procore. Users also retain the ability to change the Commitment ID in Procore).
  • Use Procore Change Order #
    The Procore Vision for Acumatica® integration requires Change Orders to be configured to Auto-Number in your ERP system. If this setting is enabled, it will only apply to the Procore Change Order ID stored for Procore, but will not be used as the Change Order number in Procore Vision for Acumatica®.
  • Procore's Budget Direct Cost Column
    • Read only, populate from Procore Vision for Acumatica®
      On Procore Vision for Acumatica®  integrated projects, the Budget's 'Direct Cost' column can either be read only and populated with data from Procore Vision for Acumatica® or editable and not populated from Procore Vision for Acumatica®.
      OR
    • Editable, do not populate from Procore Vision for Acumatica®
      If you're using the Direct Costs tab, the data will always be populated from Procore's Direct Costs Tool.
  • Edit Synced Direct Costs Transactions
    • If this setting is enabled, ERP synced Direct Cost Transactions will become editable in the Procore Direct Cost tool. These updates will NOT sync back to Procore Vision for Acumatica®.
    • You must also have the Direct Cost tool active on the project and have 'Enable Job Cost Transactions Syncing' selected on the Project Admin page. 
  • Vendors will be automatically updated
    • This feature will update mapped Vendor data fields in Procore if changed in Procore Vision for Acumatica®. These fields include Address, Phone Number, Fax Number, Name, etc. Changes made in Procore will not automatically update the Procore Vision for Acumatica® record. 

sync schedule

Procore-Managed Auto Sync

  • This feature is not currently supported for the Procore Vision for Acumatica® Integration. Job Cost Syncs do run a nightly, automatic sync process.
  • Staged Vendors for Import Syncs and Payments for Synced Subcontract Invoice Syncs are scheduled to run twice daily. This daily sync is configured in the integration microservice by default.

Exports

  • Exports happen instantly upon approval by your organization’s Accounting User(s). Imports happen upon requests which can be made by your Project and Accounting Teams directly within Procore. In addition to on-demand imports, there is an automatic nightly import of data.

company level work breakdown structure (wbs)

Considerations

  • When the integration goes live, the Procore Vision for Acumatica® standard task cost code and account group lists are automatically imported to Procore as a separate list than your Procore standard cost code list. This is the company level cost code list to be used on new projects. This list is managed in Procore Vision for Acumatica®'s Cost Code page, form PM209500.
  • To add a new cost code to the Procore Vision for Acumatica® synced company level cost code list in Procore, simply add it to Procore Vision for Acumatica®, Cost Code page, form PM209500. Then sync the new cost codes with Procore's 'Procore Vision for Acumatica® Standard Cost Codes' list in the Company level Admin tool.

Limitations

  • Cost codes that import from Procore Vision for Acumatica® will display in Procore as Division, followed by Cost Code. For example, if a division 10 cost code is set up in Procore Vision for Acumatica® as 10600.000, it will appear as "10-600.000". 
  • The use of WBS custom segments with this integration does not currently support the use of the same cost code/cost type combinations between Custom Segment codes. Please contact ERP Support for assistance in syncing your budget and budget codes with custom segments

project level work breakdown structure (wbs)

Limitations

  • Procore Vision for Acumatica® does not support project specific cost codes. All project level cost codes must originate from the ERP synced Procore Vision for Acumatica® standard cost code list.

Requirements

  • The Project WBS will require the creation of at least one (1) 'Task' segment to map as Project Tasks to Procore Vision for Acumatica®. Multiple 'Tasks' can be set up as desired.
  • Cost Codes from the Company list should be added to the Cost Code segment of the WBS upon job creation. This segment will be what the 'Tasks' leverage when creating project level financial data in Procore.

Considerations

  • Any project level cost codes that are not synced will automatically sync with your ERP when exporting your budget.

projects

Limitations

  • Projects that are in-progress or created before connection of the integration cannot be synced. Please contact your Procore Account Executive to request Professional Services for assistance with integrating in-progress/pre-existing project records for an additional fee.
  • Project syncing is Export only. All jobs must be created in Procore and sent to the Procore Vision for Acumatica® system. 

Project Syncing Requirements

  • Cost Codes from the Company list should be added to the Cost Code segment of the WBS upon job creation, and have at least one (1) cost type assignment before the Project can be exported to in Procore Vision for Acumatica®.
  • If your cost codes already have cost type assignments in the ERP Tool matrix, your company has already configured the cost type assignments for your cost codes.
  • The Project WBS will require the creation of at least 1 “Task” segment to map as Project Tasks to Procore Vision for Acumatica®. Multiple “Tasks” can be set up as desired.
  • The ERP Job ID must be defined during export, and can be alphanumeric. The following special characters are also supported in Job IDs: (.) periods, spaces , (-) dashes, dollar signs ($), and commas (,).
    • Note: If auto-numbering is enabled in Procore Vision for Acumatica®, the Job ID defined in Procore will be overwritten in Procore Vision for Acumatica® with the next id in the defined Procore Vision for Acumatica® sequence.
  • When entering your project data, be aware of the following requirements:
    • Project Name. Procore Vision for Acumatica® imposes a maximum of thirty (30) characters limit. If your project name exceeds this limit, your project name will be truncated in Procore Vision for Acumatica®.
    • Project Address. Procore Vision for Acumatica® does not permit the use of commas (,) in the 'Project Address' field. 
    • Active Project. Procore Vision for Acumatica® requires you to set your new project as 'Active' in Procore. 

Considerations

  • When a project is exported from Procore to Procore Vision for Acumatica® it is separate from the export of a project's budget amounts and budget codes.

sub jobs

Limitations

  • You cannot delete a Sub Job if ther are cost cost codes tied to that Sub Job.
  • Deleting or altering a Project Task or Task ID in Procore Vision for Acumatica® will not delete or update its Sub Job in Procore. 

Requirements

  • To use Sub Jobs with Procore financial data, the parent project must already be synced with Procore Vision for Acumatica®, in Procore Vision for Acumatica®.
  • The Sub Jobs must also have Cost Code/Cost Types added to them in the WBS.
  • If using Sub Jobs to create financial data in Procore, you will need to assign both a main project Task and a Sub Job to line items.

Considerations

  • Sub Jobs are not a required segment on your Procore projects, nor are they required for Procore Vision for Acumatica®.
  • Sub Jobs are segments that can be enabled to track smaller job segments within the overall main project. For example: A multi-building apartment complex project may want to track the costs of Buildings A, B, and C separately under one main project in Procore. Setting up a Sub Job for each building can accomplish this.
  • Sub Jobs will also integrate as 'Project Tasks' in  Procore Vision for Acumatica®, and are coupled with the main project’s Task IDs.
    • Sub Job Task IDs will appear in Procore Vision for Acumatica® with an ID format of 'Sub Job ID - Task ID'.
  • Sub Job IDs and their budget codes, much like the parent project’s Task(s) and budget codes, are exported automatically when added to the Procore budget.

budget

Requirements for Original Budget Estimate Exports from Procore

  • The Budget tool must be an active tool on the project.
  • The Procore project must be synced.
  • The budget must be locked before the export.
  • The budget codes must have successfully auto exported to Procore Vision for Acumatica®.

Syncing

  • You can export budgets containing original line items with $0 values from Procore to Procore Vision for Acumatica®.

Limitations

  • Important! Budget Estimate syncing is an export feature only.
    • Budgets must orginate from Procore in order to be integrated with Procore Vision for Acumatica®.
  • The Procore + Procore Vision for Acumatica® does NOT sync 'Unit of Measure (UOM)' and 'Unit Qty' values between systems. Currently, the Budget sync is amount-based only.
  • When a Procore budget is exported to Procore Vision for Acumatica®, the cost budget lines in Procore Vision for Acumatica® inherit a Project Task ID association. Changing that Task ID line association in Procore Vision for Acumatica® will not update the association information within the integration. If the Task ID value is not what was intended, it signifies that the cost code(s) were not synced in the manner laid out in your Project and Sub Job workflow training.  
  • The use of WBS custom segments with this integration does not currently support the use of the same cost code/cost type combinations between Custom Segment codes. Please contact ERP Support for assistance in syncing your budget and budget codes with custom segments. 

budget changes

Limitations

  • Important! Budget Changes are an export only feature. They must be created in Procore to export and sync with Procore Vision for Acumatica®.

Considerations

  • Budget Changes will post to Procore Vision for Acumatica® with a status of “On Hold” as a “Potential Budget CO“, and will require an accounting admin to remove and release the Budget Change Order to the Procore Vision for Acumatica® Project’s Cost Budget as an “Approved Budget CO".

companies

Import Companies to Procore

  • You can filter companies that are ready for import by company type using the Type filter under the Companies tab on the ERP Integrations page.
    Note: You can filter companies by type, even those without a company type, to be synced to Procore.

Limitations

  • The Company/Vendor insurance is not included when importing/exporting a Company/Vendor, as that field is not within the Procore Vision for Acumatica® AP Vendor data table. This information is in a different data table in Procore Vision for Acumatica® that is not a part of this integration.

Considerations

  • The ERP Vendor ID is entered manually by an Accounting Approver when a Company is exported from Procore to Procore Vision for Acumatica®. This is stored as the ERP Vendor ID (you can view it in the ERP Integrations tool, under Companies, or in the company-level Directory tool) and is then used on other vendor related exports (Commitments, Commitment CO’s).
    • Note: This can be an optional field during exporting if this option has been enabled by Procore.

Additional Information

  • It's strongly recommended that you first try to link any Procore Vision for Acumatica® vendors that already exist in your Procore account's Company level Directory before adding vendors from Procore Vision for Acumatica®.

Commitments

Considerations

  • When a Subcontract is exported from Procore, a Subcontract is created in Procore Vision for Acumatica® (SC301000). 
  • When a Purchase Order is exported from Procore, a Purchase Order is created in Procore Vision for Acumatica® (PO301000).
  • In Procore, Commitments are accessed from the project-level Commitments tool.

Limitations

  • Important! - Export from Procore only. Commitments must always be created in Procore, in order to sync with Procore Vision for Acumatica®. Do NOT create commitments directly in Procore Vision for Acumatica®, as they cannot be imported to Procore.
  • The maximum character length for a commitment's title is 60. This is the maximum number of characters allowed by Procore Vision for Acumatica®.
  • The maximum character length for a commitment's number is 15. This is the maximum number of characters allowed by Procore Vision for Acumatica®.

Commitment change orders

Considerations

  • When a Subcontract Change Order  or Purchase Order Change Order is exported to Procore Vision for Acumatica®, the export will also update the Budget Amount in Procore Vision for Acumatica® (PM308000 > Reference Number > Cost Budget and Commitments tabs). 
  • When creating a  CCO in Procore, you will be required to set CCO SOV lines to either create a new contract SOV line, or update an existing contract SOV line.  When exported to Procore Vision for Acumatica®, the original contract will reflect the SOV setting(s) you elected in Procore.

Limitations

  • Important! - Export from Procore only. Commitment Change Orders must always be created in Procore, in order to sync with Procore Vision for Acumatica®. Do NOT create commitment change orders directly in Procore Vision for Acumatica®, as they cannot be imported to Procore.
  • To add a Schedule of Values (SOV) line item to a CCO, it must be tied to an existing  cost code and category.

subcontractor invoices
(Subcontract Invoices and Purchase Order Invoices)

Requirements

  • To be able to successfully export Subcontractor Invoices from Procore, each AP vendor in Procore Vision for Acumatica® must be set up with a default AP Account, Cash Discount, AP Sub , and Discount Sub accounts (AP303000 > Vendor > GL Accounts tab). 

  • Each vendor in Procore Vision for Acumatica® must also must be set up with a default Cash Account (AP303000 > Vendor > Payment tab). 

  • Each job must also have a default location ID populated in Procore Vision for Acumatica® (AP303000 > Vendor > Location tab). 

Considerations

  • Important! - Export from Procore only. Subcontractor Invoices must always be created in Procore, in order to sync with Procore Vision for Acumatica®. If you create the subcontractor invoice in Procore Vision for Acumatica®, the invoice and its detail will remain in Procore Vision for Acumatica®, and not sync to Procore. 
  • If Auto Numbering for Bills is enabled in Procore Vision for Acumatica®, the Reference Number in Procore Vision for Acumatica® will be the next system generated number

Limitations

  • Subcontractor Invoice payment information recorded in Procore Vision for Acumatica® will only appear on the Procore Commitment if the invoice was synced with  Procore Vision for Acumatica®.

Payments

Limitations

  • Important! Payments are import only, unless you have purchased and implemented Procore Pay.
    • Payments made directly in Procore Vision for Acumatica® are eligible for import on synced Subcontractor Invoices.
    • Payments made in Procore Pay to synced Subcontractor Invoices will be exported to the ERP system from the ERP Integration tool’s ‘Payments’ tab.
  • Payment syncing is only supported for Subcontractor Invoice payments, NOT Owner Invoice payments at this time.

Payment Import Requirements

  • Payments in the ERP system must be to a synced Subcontractor Invoice on a synced Subcontract or Purchase Order in Procore.

Payment Import Considerations

  • A payment record will be created on the synced Procore Commitment upon import.

Procore Pay + ERP Export Requirements

  • 'AP Payments’ must be set to Auto-Number in the ERP system’s Numbering Sequence form (CS201010 > APPAYMENT).
  • A default Payment Method called ‘PROCORE’ must be configured in Procore Vision for Acumatica® in order to export payments from Procore Pay.
  • The Invoice being paid must first be Approved, Synced and ‘Open’ in the ERP System.

Payment Export Considerations

  • When disbursed from the Procore Pay tool, the payment transaction will automatically be sent to the ERP Integration tool’s ‘Payments’ tab in Procore. From there, an Accounting Approver will accept and export the payment to the ERP system.
  • Payments exported from Procore will post to Procore Vision for Acumatica® with an ‘On Hold’ Status, and will require an accounting admin to remove the hold and release the payment in the ERP system.
  • The ‘Payment Method’ listed on exported payments will be ‘PROCORE’, signifying that the invoice was paid via the Procore Pay tool.
  • If a payment fails to export, a resend can be performed from the 'Failed to Export' filter of the ERP tool’s payments tab.
  • If an invoice is partially paid in Procore Vision for Acumatica® and imported into Procore, the Procore Payments tool will update the remaining unpaid amount to prevent overpayment when paying the remaining amount in Procore Pay.

 

Prime Contracts

Considerations

  • The Procore Vision for Acumatica® Revenue Budget is importable to the Procore project’s Prime Contract tool via the Procore ERP Integration tool tab for Prime Contracts. When added to Procore, a Prime Contract is created in the project’s Prime Contract tool, and the Revenue Budget lines are populated in the Prime Contract’s SOV (Schedule of Values).
  • Within your ERP Integration settings, ERP Admins can enable the ability to designate your prime contract as either Unit-based or Amount-based before importing to Procore. 

Limitations

  • Important! Prime Contracts are imported only from Procore Vision for Acumatica® to Procore.
    • The Prime Contract import process only adds the Revenue Budget line numbers and their original budgeted value into Procore but does not sync the Revenue budget codes onto the Prime Contract SOV.
  • Any changes made to the overall value of the Prime Contract after the initial contract value is synced must be changed in Procore Vision for Acumatica® to refresh the synced Prime Contract in Procore.

Requirements

Your prime contract is eligible to be imported when the following conditions are met:

  • The Procore Vision for Acumatica® project MUST have a customer defined in the project’s header.
  • In Procore Vision for Acumatica®, the project’s 'Revenue Budget Level' setting on the ERP job's 'Summary' tab MUST be set to ‘Task and Cost Code’.
  • The project is synced with Procore Vision for Acumatica®.
  • The Revenue Budget Codes used are also synced with Cost Budget Codes in Procore.
  • At least one (1) Procore Vision for Acumatica® Revenue Budget line exists with a non-zero value.

Prime Contract Change Orders

Requirements

In order to sync a PCCO with the Acumatica ERP Connector, the 'Revenue Budget Level' setting on the ERP Job’s 'Summary' tab must be set to 'Task' only.

Requirements for Export from Procore

  • The Change Order tool must be an active tool on the project.

  • The Procore Project Prime Contract must be approved and exported to the Procore Vision for Acumatica® Projects' Revenue Budget.

  • If the synced Prime Contract is using a vertical markup, the markup(s) must have a budget code assigned to the required 'ERP Prime Contract Item' field.

Note

You can view the 'Quantity', 'Unit of Measure (UOM)', and 'Unit Cost' fields without any values for line items in PCCOs. Currently, these fields cannot be edited because the Procore + Procore Vision for Acumatica® integration does not support this capability.

Considerations

  • When a PCCO is exported to Procore Vision for Acumatica®, it will update the project's Cost and Revenue Budget. The Revenue Budget will have one summarized line for the total expected revenue value of the change.

  • A unique Acumatica Task ID will be created for each synced PCCO, and will be used on the Revenue Budget line. However, Cost Budget lines tied to the PCCO will use the existing Task ID(s) on the Cost Budget for each Budget Code on the PCCO Schedule of Values.

Limitations

Important! - Export from Procore only. Prime Contract Change Orders must always be created in Procore, in order to sync with Procore Vision for Acumatica®. Do NOT create prime contract change orders directly in Procore Vision for Acumatica®, as they cannot be imported to Procore.

owner invoices

Requirements

  • To successfully export Owner Invoices from Procore, the following settings and configurations in Procore Vision for Acumatica® are required:
    • The Customer must be defined on the Procore Vision for Acumatica® Project Header field for 'Customer'.
    • The Revenue Budget Tasks on the Procore Vision for Acumatica® Project must be marked as 'Active' (Project > Task).
    • The Procore Vision for Acumatica® Project’s 'Revenue Budget Level' on the project’s ‘Summary’ tab MUST be set to ‘Task and Cost Code.’
    • The Procore Vision for Acumatica® project must have Pro Forma billing disabled (Project > Summary > Billings and Allocation Settings > Create Pro Forma Invoice on Billing).
  • To successfully export Owner Invoices from Procore, the Procore Commitment(s) and any applicable Commitment Change Orders included in the Owner Invoice must first be integrated with the Procore Vision for Acumatica®.

Considerations

  • If Auto Numbering for AR Invoices is enabled in the Procore Vision for Acumatica® ‘Numbering Sequence’ form (CS201010 > ARINVOICE), the Reference Number in Procore Vision for Acumatica® will be the next system generated number, and the Procore Invoice # will populate in the Vendor Reference field of the invoice.
  • Owner Invoices will post to Procore Vision for Acumatica® with a ‘Balanced’ status, and will require an Accounting Admin to release the invoice in the ERP system.

Limitations

  • Important!  Export from Procore only. Owner Invoices must always be created in Procore to sync with Procore Vision for Acumatica®.  If you create the invoice inProcore Vision for Acumatica®, the invoice and its details will remain in Procore Vision for Acumatica®, and will not sync to Procore.
  • Owner Invoice payments WILL NOT sync back to Procore at this time.

job costs

Requirements

  • Procore requires the Procore Vision for Acumatica® Job Cost module.

  • Project must be synced in order for costs to automatically import from Procore Vision for Acumatica® to Procore.
  • To view the job costs in your budget, please use the ERP Budget View, or ERP Detailed Budget View that was created for you during implementation. This budget view has specific calculated and ERP integration sourced data.

Considerations

  • Costs pulled in from Procore Vision for Acumatica® accumulate as four different amount types in Procore, Subcontract Invoices (Subcontracts and Purchase Orders that have been invoiced), Invoices (invoiced amounts not related to a synced contract), Expenses (Misc. Expenses), and Payroll (Labor costs). The sum of these four amount types equal the Job to Date Cost, while the sum of the latter three types (Invoices, Expenses, Payroll) equal the Direct Cost. These are all are in lump sum form, that accumulate under the project cost code and cost type.
  • Detailed job cost transaction syncing is supported by the integration. To leverage this feature, the Direct Cost tool must be active on the project, and the "Enable Job Cost Transaction Syncing" setting should be enabled on the Project Admin General page.

Limitations

  • Job cost type restricting is not supported by the integration. For example, the integration is not customizable to omit labor costs from syncing into Procore.
 SEMI-PRIVATE ARTICLE

This article is intentionally set to 'Semi-Private.' It can only be viewed by individuals who have the link. This link can be shared with customers.

Overview

PROCORE

Exports data from Procore to Procore Edge for Acumatica®

Imports data from Procore Edge for Acumatica® to Procore

Procore Edge for Acumatica®

Notes

STANDARD COST CODES
Cost Types

 

erp-green-arrows.png

COST CODES
Account Groups

 

COMPANIES

erp-orange-arrows.png

erp-green-arrows.png

VENDORS

  • Import companies by type, including those without a specified company type from Procore Edge for Acumatica® to Procore.

PROJECTS
Sub Jobs

erp-orange-arrows.png

erp-green-arrows.png

PROJECTS
Project Tasks

 

PROJECT WBS CODES

erp-orange-arrows.png

erp-green-arrows.png

COST BUDGET CODES

  • Custom WBS segments are NOT supported at this time.

  • Add project specific codes to your Company Standard list in Accounting to sync them to Procore. Synced codes are available for use across all relevant projects.

BUDGETS
Sub Job
Project Cost Code
Project Cost Type

erp-orange-arrows.png

erp-green-arrows.png

COST BUDGETS
Project Task
Cost Code
Account Group

  • Budgets containing line items with $0 values can be exported from Procore to Procore Edge for Acumatica®.

BUDGET MODIFICATIONS

erp-orange-arrows.png

 

COST BUDGET CHANGE ORDERS

 

PRIME CONTRACTS

erp-orange-arrows.png

 

REVENUE BUDGET

 

PRIME CONTRACT CHANGE ORDERS

erp-orange-arrows.png

 

REVENUE BUDGET CHANGE ORDERS

 

COMMITMENTS 

Subcontracts & Purchase Orders
Commitment Change Orders (CCOs)

erp-orange-arrows.png

 

COMMITMENTS Subcontracts & Purchase Orders
Commitment Change Orders (CCOs)

 

SUBCONTRACTOR INVOICES

erp-orange-arrows.png

 

PAYABLES

 

SUBCONTRACTOR PAYMENTS ISSUED 2
For Synced Subcontractor Invoices

erp-orange-arrows.png

erp-green-arrows.png

PAID INVOICES

  • Import of subcontractor payment records from Procore Edge for Acumatica® is only supported in US Editions.

COSTS
Direct Cost
JTD Cost

 

erp-green-arrows.png

COSTS
Transactional Cost By Invoice, Expense, Payroll, and Subcontractor Invoice Types

 

Companies/Vendors

PROCORE

Exports data from Procore to Procore Edge for Acumatica®

Imports data from Procore Edge for Acumatica® to Procore

Procore Edge for Acumatica®

ERP Vendor ID 1

erp-orange-arrows.png

erp-green-arrows.png

Vendor ID

Name

erp-orange-arrows.png

erp-green-arrows.png

Account Name

Address
City
State
ZIP

erp-orange-arrows.png

erp-green-arrows.png

Address Line 1
City
State
Postal Code

Business Phone

erp-orange-arrows.png

erp-green-arrows.png

Business 1 Phone

Email Address

erp-orange-arrows.png

erp-green-arrows.png

Account Email

Export Note: The ERP Vendor ID is entered manually by an Accounting Approver when a company is exported from Procore to Procore Edge for Acumatica®. This is stored as the ERP Vendor ID (you can view it in the company-level ERP Integration tool under Vendors or in the company-level Directory tool) and is then used on other vendor-related exports (Commitments, CCOs). This can be an optional field during exporting if this option has been enabled by Procore.

Projects

PROCORE

Exports data from Procore to Procore Edge for Acumatica®

Imports data from Procore Edge for Acumatica® to Procore

Procore Edge for Acumatica®

Project Number

erp-orange-arrows.png

erp-green-arrows.png

Project ID 1

Project Name

erp-orange-arrows.png

erp-green-arrows.png

Description

Address
City
State
Zip

erp-orange-arrows.png

erp-green-arrows.png

Address Line 1
City
State
Postal Code

Latitude / Longitude

erp-orange-arrows.png

erp-green-arrows.png

Latitude / Longitude

Start Date/Completion Date

erp-orange-arrows.png

erp-green-arrows.png

Start Date / End Date

Subaccount ID 2

erp-orange-arrows.png

 

Default Sales Subaccount

Template ID 3

erp-orange-arrows.png

 

Template

Export note: The Procore Edge for Acumatica® Project ID is entered manually by an accounting approver when a project is exported from Procore to Procore Edge for Acumatica®. This may or may not, depending on what the accounting approver has entered, match the Project Number found in Procore under the project-level Admin tool. This is stored as the Procore Edge for Acumatica® Project ID (you can view it in the company-level ERP Integrations tool under the Synced section of Projects) and is then used on other project-related exports such as Budgets, commitments, etc. Import note: If the project is imported from Procore Edge for Acumatica®, the project ID will automatically populate in the project number field.

2 Export note: The Subaccount ID is entered manually by an accounting approver when a project is exported from Procore to Procore Edge for Acumatica®. It's an optional field, only required if the customer has enabled Subaccounts in Procore Edge for Acumatica®. If the project is imported into Procore from Procore Edge for Acumatica®, the Subaccount ID is not stored on the project in Procore.

3 Export note: The Template ID is entered manually by an accounting approver when a project is exported from Procore to Procore Edge for Acumatica®. It's an optional field. If the project is imported into Procore from Procore Edge for Acumatica®, the Template ID is not stored on the project in Procore.

Sub Jobs/Project Task

PROCORE

Exports data from Procore to Procore Edge for Acumatica®

Imports data from Procore Edge for Acumatica® to Procore

Procore Edge for Acumatica®

Code

erp-orange-arrows.png

erp-green-arrows.png

Task ID

Sub Job Name

erp-orange-arrows.png

erp-green-arrows.png

Description

Cost Code
Cost Code
Description

erp-orange-arrows.png

erp-green-arrows.png

Cost Code 1
Cost Code
Description

Cost Type Cost Type

erp-orange-arrows.png

erp-green-arrows.png

Account Group 1 Account Group

Import note: If the Project Task in Procore Edge for Acumatica® has cost codes and account groups defined on the cost budget tab, then those cost codes and account groups will import along with the Project Task. If there are no cost codes or account groups defined on the cost budget, only the project task will import into Procore.

Standard Cost Codes/Cost Codes

In Procore, the Cost Codes can be found in the Work Breakdown Structure (WBS) section in the Admin Tool under Procore Edge for Acumatica® Standard Cost Codes. Custom WBS segments are not supported for the integration at this time.

PROCORE

Exports data from Procore to Procore Edge for Acumatica®

Imports data from Procore Edge for Acumatica® to Procore

Procore Edge for Acumatica®

Cost Code

 

erp-green-arrows.png

Cost Code

Description

 

erp-green-arrows.png

Description

Standard Cost Types/Account Groups

In Procore, the Cost Types can be found in the Cost Types section in the Admin Tool under Procore Edge for Acumatica® Standard Cost Types.

PROCORE

Exports data from Procore to Procore Edge for Acumatica®

Imports data from Procore Edge for Acumatica® to Procore

Procore Edge for Acumatica®

Cost Type

 

erp-green-arrows.png

Account Group

Description

 

erp-green-arrows.png

Description

Budgets/Cost Budget

All budgets totals are entered against the Project Task (In Procore Edge for Acumatica®>Project>Cost Budget) or the Sub Job (In Procore>Budget Tool)

PROCORE

Exports data from Procore to Procore Edge for Acumatica®

Imports data from Procore Edge for Acumatica® to Procore

Procore Edge for Acumatica®

Original Budget Amount

erp-orange-arrows.png

erp-green-arrows.png

Original Budgeted Amount

Sub Job

erp-orange-arrows.png

erp-green-arrows.png

Project Task

Cost Code

erp-orange-arrows.png

erp-green-arrows.png

Cost Code

Category

erp-orange-arrows.png

erp-green-arrows.png

Account Group

Budget Modifications

Budget modifications export from Procore only. In Procore, budget mods are accessed from the project-level Budget tool.

When Budget Modifications are exported from Procore, a Cost Budget Change Order is created on the Project in Procore Edge for Acumatica®. It will arrive with an "On Hold" status. In Procore, budget modifications are accessed from the Budget Modifications column in the project-level Budget tool. They are used to move money from one budget line item to another, most commonly with a zero net effect.

 Phased Release: Budget changes

Some ERP integrated clients may have already transitioned from Budget Modifications (Legacy) to the new Budget Changes experience. The legacy experience will continue to be available until November 2024. To learn more about the timeline for migration, see Common Questions.


Choosing to use the new Budget Changes experience will not impact the function of your ERP integration. You should still thoroughly review the available documentation before migrating to the new experience. We recommend you also discuss any concerns or questions about migrating your Budget Modifications to Budget Changes with your Procore point of contact .


To learn more about the new Budget Changes experience, see About Budget Changes.

PROCORE

Exports data from Procore to Procore Edge for Acumatica®

Imports data from Procore Edge for Acumatica® to Procore

Procore Edge for Acumatica®

Change Date 1

erp-orange-arrows.png

 

Change Date

Sub Job

erp-orange-arrows.png

 

Project Task

Cost Code

erp-orange-arrows.png

 

Cost Code

Cost Type

erp-orange-arrows.png

 

Account Group

Budget Modification Amount

erp-orange-arrows.png

 

Amount

1 Export note: The Change Date is entered manually by an accounting approver when the budget mod is exported from Procore to Procore Edge for Acumatica®.

Prime Contracts

Prime Contracts export from Procore only. Prime contracts in Procore automatically sync to Acumatica Cloud ERP as a summarized single line item within the Revenue Budget tab. Your prime contract is automatically synced when the following conditions are met:

  • The project is synced with Procore Edge for Acumatica®.

  • A prime contract exists in the 'Approved' status.

  • At least one (1) line item with a non-zero value has been added to the contract's schedule of values (SOV).

  • The contract number must consist of no more than seven (7) alphanumeric characters.

Any changes made to the overall value of the contract after the initial contract value is synced must be manually updated in the ERP system.

PROCORE

Exports data from Procore to Procore Edge for Acumatica®

Imports data from Procore Edge for Acumatica® to Procore

Procore Edge for Acumatica®

Amount (Schedule of Values tab)

erp-orange-arrows.png

 

Original Budgeted Amount (Project Revenue Budget)

1 Prime Contract Number can be changed before export in the ERP Integrations tool, resulting in a non-matching number between the corresponding fields. If Auto Numbering is enabled in Procore Edge for Acumatica®, the Prime Contract number in Procore Edge for Acumatica® will be the next system-generated number.

Prime Contract Change Orders

Prime Contract Change Orders (PCCOs) export from Procore only. When entering the SOV for a PCCO in Procore, you have the option of selecting an existing line item or entering a new line item. In Procore, PCCOs are accessed from the project level Prime Contracts tool under Change Orders. In Procore Edge for Acumatica®, the change(s) will appear as a Revenue Change Order with a Status of On Hold.

PROCORE

Exports data from Procore to

Procore Edge for Acumatica®

Imports data from

Procore Edge for Acumatica®

to Procore

Procore Edge for Acumatica®

System Date at Time of Prime Contract Creation

erp-orange-arrows.png

 

Change Date Approval Date

PCCO Number 1

erp-orange-arrows.png

 

Reference Nbr External ID

Title (General tab)

erp-orange-arrows.png

 

Description

Description (Schedule of Values tab)

erp-orange-arrows.png

 

Description

Project Number

erp-orange-arrows.png

 

Project

Sub Job

erp-orange-arrows.png

 

Project Task

Cost Code (Schedule of Values tab)

erp-orange-arrows.png

 

Cost Code (Cost Budget Tab)

Cost Type (Schedule of Values tab)

erp-orange-arrows.png

 

Account Group (Cost Budget Tab)

Potential Change Order Amount

erp-orange-arrows.png

 

Amount (Cost Budget Tab)

Potential Change Order Amount + Markup(s) Amount

erp-orange-arrows.png

 

Amount (Revenue Budget Tab) 2

1 PCCO Number can be changed before export in the ERP Integrations tool, resulting in a non-matching number between the corresponding fields. If Auto Numbering for Change Orders is enabled in Procore Edge for Acumatica®, the Change Order number in Procore Edge for Acumatica® will be the next system-generated number.

Markup Amounts=Gross Margin Amount (except when using Markup to Estimate, then markups are included in Change Total Amount).

Commitments

Commitments export from Procore only. When a Commitment (Subcontract or Purchase Order) is exported from Procore, a commitment is automatically created in Procore Edge for Acumatica®. For Subcontracts, a status of Open will be used in Procore Edge for Acumatica®. The Project used in Procore will be sent to the Project field on the commitment line item in Procore Edge for Acumatica®. For Purchase Orders, a status of Open will be used in Procore Edge for Acumatica®. For Purchase Orders, the type of Normal will be used in Procore Edge for Acumatica®. In Procore, Commitments are accessed from the project-level Commitments tool.

PROCORE

Exports data from Procore to Procore Edge for Acumatica®

Imports data from Procore Edge for Acumatica® to Procore

Procore Edge for Acumatica®

System Date at Time of Commitment Creation

erp-orange-arrows.png

 

Date

Start Date (Subcontract)

Delivery Date (Purchase Order)

erp-orange-arrows.png

 

Start Date (Subcontract)

Promised On (Purchase Order)

Commitment # 1

erp-orange-arrows.png

 

Subcontract Nbr (for Subcontracts)
Order Nbr (for Purchase Orders)
External Ref (Subcontracts and Purchase Orders)

Contract Company

erp-orange-arrows.png

 

Vendor

Title (General tab)

erp-orange-arrows.png

 

Description

Default Retainage

erp-orange-arrows.png

 

Retainage Percent

Budget Code (Schedule of Values tab)
Sub Job
Cost Code
Cost Type

erp-orange-arrows.png

 

Project Task
Cost Code
Inventory ID 2

Description (Schedule of Values tab)

erp-orange-arrows.png

 

Line Description

Qty (Schedule of Values tab), if applicable

erp-orange-arrows.png

 

Order Qty

Unit Cost (Schedule of Values tab), if applicable

erp-orange-arrows.png

 

Unit Cost

Amount (Schedule of Values tab)

erp-orange-arrows.png

 

Ext. Cost

Commitment # can be changed before export in the ERP Integrations tool, resulting in a non-matching number between the corresponding fields. If Auto Numbering for Subcontracts and/or Purchase Orders is enabled in Procore Edge for Acumatica®, the Subcontract/Purchase Order number in Procore Edge for Acumatica® will be the next system-generated number.

The Inventory ID comes from the Account Groups(Cost Type)>Procore Integration>Default Non-Stock setting in Procore Edge for Acumatica®.

Commitment Change Orders

Commitment Change Orders export from Procore only. When entering the SOV for a Commitment Change Order in Procore, you have the option of selecting an existing line item or entering a new line item. In Procore, Commitment Change Orders are accessed from the project level Commitments tool under Commitment Record. In Procore Edge for Acumatica®, the change(s) will appear as a Commitment Change Order with a Status of Closed.

PROCORE

Exports data from Procore to Procore Edge for Acumatica®

Imports data from Procore Edge for Acumatica® to Procore

Procore Edge for Acumatica®

System Date at Time of Commitment Creation

erp-orange-arrows.png

 

Change Date Approval Date

Commitment Change Order # 1

erp-orange-arrows.png

 

Change Order
Reference Nbr
External Reference Nbr

Contract Company

erp-orange-arrows.png

 

Vendor

Title (General tab)

erp-orange-arrows.png

 

Description

Description (Schedule of Values tab)

erp-orange-arrows.png

 

Description

Project Number Sub Job

erp-orange-arrows.png

 

Project
Project task

Cost Code (Schedule of Values tab)

erp-orange-arrows.png

 

Cost Code

Cost Type (Schedule of Values tab)

erp-orange-arrows.png

 

Inventory ID 2

Qty (Schedule of Values tab), if applicable

erp-orange-arrows.png

 

Quantity

Unit Cost (Schedule of Values tab), if applicable

erp-orange-arrows.png

 

Unit Cost

Amount
(Schedule of Values tab)

erp-orange-arrows.png

 

Amount

Description
(General tab)

erp-orange-arrows.png

 

Detailed Description

Commitment Change Order # can be changed before export in the ERP Integrations tool, resulting in a non-matching number between the corresponding fields. If Auto Numbering for Change Orders is enabled in Procore Edge for Acumatica®, the Change Order number in Procore Edge for Acumatica® will be the next system-generated number.

The Inventory ID comes from the Account Groups(Cost Type)>Procore Integration>Default Non-Stock setting in Procore Edge for Acumatica®.

Job Costs

Job costs import from Procore Edge for Acumatica® only. Cost information is retrieved from Procore Edge for Acumatica® for each Sub Job/Cost Code/Category on Synced projects for use in 2 locations in Procore, the Budget and the Job Costs report. If Job Cost Transaction Syncing is enabled on the Procore Project, cost transactions from Procore Edge for Acumatica® are imported into the Direct Cost tool for each project. This provides transaction detail for the costs displayed in Procore, and if the budget view is configured properly the values of those transactions can be viewed in the Direct Costs or JTD Cost columns for a budget line item.

PROCORE

Exports data from Procore to Procore Edge for Acumatica®

Imports data from Procore Edge for Acumatica® to Procore

Procore Edge for Acumatica®

Direct Cost Type

     

Invoice

 

erp-green-arrows.png

Invoices

Subcontractor Invoice

 

erp-green-arrows.png

Commitment Invoices

Payroll

 

erp-green-arrows.png

Payroll

Expense

 

erp-green-arrows.png

Misc Expenses

Direct Cost

     

Received Date

 

erp-green-arrows.png

Transaction Date

Status

 

erp-green-arrows.png

Automatically set to Approved

Employee

 

erp-green-arrows.png

 

Description

 

erp-green-arrows.png

Description

Vendor

 

erp-green-arrows.png

Vendor (Only for transactions that originate from Accounts Payable)

Invoice #

 

erp-green-arrows.png

Invoice (Only for transactions that originate from Accounts Payable)

Budget Code

 

erp-green-arrows.png

Project Task
Cost Code
Account Group

Qty

 

erp-green-arrows.png

Quantity

Unit Cost

 

erp-green-arrows.png

Unit Rate

Amount

 

erp-green-arrows.png

Amount

Budget

     

JTD Cost

 

erp-green-arrows.png

Actual Amount

Direct Costs

 

erp-green-arrows.png

JTD Cost - Commitment Invoiced 1

Job Costs Report

     

Sub Job

 

erp-green-arrows.png

Project Task

Cost Code

 

erp-green-arrows.png

Cost Code

Cost Type

 

erp-green-arrows.png

Account Group

Original Budget

 

erp-green-arrows.png

Original Budgeted Amount

Original Budget Units

 

erp-green-arrows.png

Original Budgeted Quantity

Approved Budget Changes

 

erp-green-arrows.png

Budgeted CO Amount

Approved Budget Unit Changes

 

erp-green-arrows.png

Budgeted CO Quantity

Revised Budget

 

erp-green-arrows.png

Revised Budgeted Amount

Revised Budget Units

 

erp-green-arrows.png

Revised Budgeted Quantity

Commitment Invoiced

 

erp-green-arrows.png

Committed Invoiced Amount

Job To Date Cost

 

erp-green-arrows.png

Actual Amount

Direct costs are calculated from Job To Date Cost minus Commitment Invoiced.

Subcontractor Invoices

When a subcontractor invoice is exported from Procore to Procore Edge for Acumatica®, an AP Bill is automatically created in Procore Edge for Acumatica®. In Procore, Subcontractor Invoices are accessed from Invoices in the project Commitments tool. In Procore Edge for Acumatica®, the Bill will have a status of On Hold.

  • Note:

    • Only Subcontractor Invoices created against Subcontracts will export to Acumatica.

    • For customers who have multiple Cash Accounts in Acumatica, Procore will export subcontractor invoices to the Cash Account defined on the Acumatica project>USER-DEFINED FIELDS.

PROCORE

Exports data from Procore to Procore Edge for Acumatica®

Imports data from Procore Edge for Acumatica® to Procore

Procore Edge for Acumatica®

Billing Date

erp-orange-arrows.png

 

Date

Project

erp-orange-arrows.png

 

Project

Commitment #

erp-orange-arrows.png

 

Subcontract Nbr.

Overall Comments

erp-orange-arrows.png

 

Description

Contractor Company

erp-orange-arrows.png

 

Supplier

Invoice # 1

erp-orange-arrows.png

 

Reference Nbr Supplier Ref

Payment Due

erp-orange-arrows.png

 

Amount

Budget Code (Detail Tab)
Sub Job
Cost Code
Cost Type

erp-orange-arrows.png

 

Project Task
Cost Code
Inventory ID 2

This Period (Detail Tab)

erp-orange-arrows.png

 

Amount

Work Retainage Held %
Work Retainage Held $
Work Retainage Released %
Work Retainage Released $

erp-orange-arrows.png

 

Retainage Held Amount
Retainage Held Percent
Retainage Released Amount
Retainage Released Percent

Accounting Date

erp-orange-arrows.png

 

Date

If Auto Numbering for Bills is enabled in Procore Edge for Acumatica®, the Reference Number in Procore Edge for Acumatica® will be the next system-generated number.

The Inventory ID comes from the Account Groups(Cost Type)>Procore Integration>Default Non-Stock setting in Procore Edge for Acumatica®.

Commitment Payments Issued

Commitment Payments Issued imported from Procore Edge for Acumatica® only. When a subcontractor invoice is exported from Procore to Procore Edge for Acumatica®, an AP Bill is automatically created in Procore Edge for Acumatica®. When the AP Bill is paid, the payment information will flow back to Procore. In Procore, Subcontractor Invoices Payments are accessed from Payments Issued in the project Commitments tool. In Procore Edge for Acumatica®, payments are accessed from Payables>Checks and Payments.

PROCORE

Exports data from Procore to Procore Edge for Acumatica®

Imports data from Procore Edge for Acumatica® to Procore

Procore Edge for Acumatica®

Invoices

 

erp-green-arrows.png

n/a

Date

 

erp-green-arrows.png

Post Date

Payment #

 

erp-green-arrows.png

Reference Nbr

Invoice #

 

erp-green-arrows.png

Supplier Ref

Check / Ref #

 

erp-green-arrows.png

Payment Ref

Amount

 

erp-green-arrows.png

Payment Amount

Procore Pay Payments

General Availability in Select Markets (United States)

flag-us.png Procore Pay  is available in the United States. It is designed for General Contractors and Owner-Builders who act as their own General Contractors on a job. Procore Pay extends the Invoice Management functionality in the Procore web application to handle the payment process between general and specialty contractors.

PROCORE

Exports data from Procore to Acumatica®

Imports data from Acumatica® to Procore

Acumatica®

Date Payment Funded

erp-orange-arrows.png

erp-green-arrows.png

Application Date

Check Number

erp-orange-arrows.png

erp-green-arrows.png

Payment Ref

Payment Method

erp-orange-arrows.png

erp-green-arrows.png

Payment Method (ACH, CHECK)

Amount

erp-orange-arrows.png

erp-green-arrows.png

Payment Amount

Amount

erp-orange-arrows.png

erp-green-arrows.png

Details - Amount Paid