When your company has enabled the ERP Integrations tool and configured it to work with Sage 100 Contractor®, thre are two ways to synchronize the data between the two systems: On-Demand Sync and Proco...When your company has enabled the ERP Integrations tool and configured it to work with Sage 100 Contractor®, thre are two ways to synchronize the data between the two systems: On-Demand Sync and Procore-Managed Auto Sync. To learn about the types of data that is synced, see What data is synced between Procore and Sage 100 Contractor®?
To edit or delete direct cost transactions after they have been synced with your ERP system. Editing or deleting direct cost transactions can cause the costs in the Procore project and the synced ERP ...To edit or delete direct cost transactions after they have been synced with your ERP system. Editing or deleting direct cost transactions can cause the costs in the Procore project and the synced ERP project to no longer match. If the synced direct cost transaction data is ever re-synced from your ERP integration, any updates you've made will be overwritten. This setting will allow you to edit or delete direct cost transactions synced with your ERP system.
To retrieve an ERP-synced project that was sent the ERP Integrations tool. A project can only be retrieved before the it's accepted or rejected by an accountant.