Skip to main content
Procore

Reorder Revisions of a Drawing (Tucker HiRise)

Background

By default, drawing revisions are ordered based on the 'Drawing Date' that is entered when uploading drawings. The revisions for a drawing can be reordered while reviewing drawings, but they can also be reorganized at any time on the drawing's General Information page.

 

Steps

  1. Navigate to your project's Drawings tool.
  2. Click Info next to the drawing of which you want to reorder revisions.
  3. In the 'Versions' section, click and hold over the grip (⁞⁞) icon and use a drag-and-drop operation to arrange the revisions into a new order.

    reorder.png

    Note: The changes are saved automatically.

Things to Consider​

  • Required User Permission:
    • 'Admin' on the project's Drawings tool.
  • Prerequisites: