Add Plan Revisions Entries (Android)
Background
The Plan Revisions section allows you to add information for tracking project plans based on revision number, title, and category. It also provides a dedicated space for entering comments.
Things to Consider
-
Required User Permissions:
-
To create entries:
-
'Standard' or 'Admin' level permissions on the project's Daily Log tool.
-
-
To create pending entries as a collaborator:
-
'Read Only' or 'Standard' permissions to the Daily Log tool with the 'Collaborator Entry Only' granular permission enabled on your permissions template.
See Create Daily Log Entries as a Collaborator.
-
-
-
Additional Information:
-
Procore recommends that you use the Drawings tool to track plan revisions and changes to the project's drawings.
-
-
This action can be performed offline. Tasks performed offline sync with Procore once a network connection is reestablished.
Steps
-
Open the Procore app on an Android mobile device and select a project.
The Tools screen loads, displaying all tools available for this project. -
Tap the date to select the calendar day for which you want to create a new entry.
-
Tap
to create a new entry. -
Tap Plan Revisions.
-
Tap into the following fields to enter the relevant information:
Note: Click the caret icon > to expand and v to collapse the field names and their descriptions below.
-
Tap Save.
The log entry is created or added.Tip
- Click Fix Errors to navigate to the first empty required field (if the required fields are empty or blank).
- Click Next Field or Previous Field to view other empty fields. Once all required fields are filled, you are able to create or save the form.

