Document Management Process
-
All VDC documents are to be located here: Dropbox (Harvey's P&H)\All Employees\Jobs\202x Jobs\“Contractor Name”\“Job Name”\Design
-
Equipment Folder – Any new or modified equipment spec sheets/additional information
-
Plansets – All VDC prints to be located here
-
Revit – All Revit/CAD models from external parties
-
-
After a “final” print, it is the Engineering Team’s responsibility to copy the relevant documents to the All Employees\Job\Planset folder: Dropbox (Harvey's P&H)\All Employees\Jobs\202x Jobs\“Contractor Name”\“Job Name”\Planset
-
A “final” planset includes any drawings that are to be used by the field installers
-
-
After a "final" VDC Print all documents are to be saved to the All Employees\Jobs\202x Jobs\“Contractor Name”\“Job Name”\Construction
-
This folder should only contain the most current and relevant documents
-
When documents become irrelevant, put them in the archive folder within the construction folder
-
-
After dropping a document in the Construction folder, it is the Engineering Team’s responsibility to email Josh (josh.roberts@harveysph.com) to let him know there is an updated Planset
-
Josh will archive any outdated drawings
-
Josh will upload the new drawings to Procore
-
Josh will send out an email to the relevant project team members letting them know a new planset has been posted and provide a brief summary of what has changed
-