Concrete Sleeving Plan

Foundation Sleeve Plan 

  • Water main entrance 7.5’ below grade 

  • SEWER preferably on top of footer, 4’ below grade (frost line) 

  • Gas entrance 2-3’ above grade  

  • Downspouts 2' above grade 

  • HOSE BIBS 2’ ABOVE GRADE