Subcontractor Scope Requirements

  1. Critical Sub-Specific Items. For example:
    1. Cranes - 140 MPH Wind Speed Requirements – review master scope sheet for details.

  2. Difficult Scopes
    1. Metals

    2. Waterproofing

  3. BIM – Standard in Scope Sheets
    1. Get quotes from subs and check their capabilities.

    2. MEP

    3. Concrete

    4. Metals

  4. Extended Warranties
    1. Roofing

    2. Waterproofing

    3. Aluminum Finishes

    4. Glass

    5. Etc.

  5. Subcontractor Permit Costs