Skip to main content
Procore

Integration by Procore: Resend a Rejected PCCO to ERP Integrations for Accounting Acceptance

Objective

To resend a Prime Contract Change Order (PCCO) to the ERP Integrations tool for accounting acceptance.

Background

If you have a PCCO in Procore that does NOT exist in Viewpoint® Spectrum®, you can export it to Viewpoint® Spectrum®. The first step in this process is to locate the PCCO in the Project level Prime Contract tool. Next, use the steps below to resend it to the ERP Integrations tool. An accounting approver can then review the PCCO and accept or reject it. After it is accepted by the approver, the data is exported from Procore to Viewpoint® Spectrum®.

Things to Consider

  • Required User Permission:
    • 'Admin' level permission on the Project level Prime Contract Tool. 
  • Prerequisites:
  • Requirements:
    • The Date field on a change order is required.
    • The Billing Item Code must be 10 characters or less.

Steps

  1. Navigate to the Project level Prime Contracts tool.
  2. Click the Change Orders tab.
  3. Locate the desired PCCO in the list.
  4. Choose from these options:
    • If the PCCO is in the Approved status, click View
      view-approved-erp-pcco.png
      OR
       
    • If the PCCO is in any other status, click Edit. Then change the status to Approved and click Save at the bottom on the page.
      Note: You must have 'Admin' level permission on the Prime Contract tool or be a 'Designated Approver' on the PCCO to change the status of a PCCO to Approved.
      edit-draft-erp-pcco.png
  5. If the PCCO is in the 'Approved' status, click Resend to ERP.
    Note: If this button is grayed out and unavailable, it is most likely because the PCCO has not been approved. Hover your mouse cursor over the tooltip for more information. 

    send-to-erp.png

    The system sends the PCCO to the Company level ERP Integrations tool and the icon at the top of the page changes to BLUE. See What do the ERP icons mean?

Next Step

  • Integration by Procore: Accept or Reject a PCCO for Export to Viewpoint® Spectrum®