Copilot: Sample Questions
RFIs
- Do we have any RFIs on the elevator sump pit?
- What RFIs have been asked regarding the exterior siding?
- Where is the fire protection RFI?
- What RFIs are related to fume hoods?
- What RFIs have been asked about the brick work?
- Is there an RFI on the window film?
- What RFI changed window size?
- What RFIs have affected exterior corridor topping slabs?
- Which RFI relates to the ATS pad?
- Please summarize the response to RFI 67.
- Are there any RFIs that reference engine exhaust?
Submittals
- What is the size of the hepa filter for the cleanroom air shower?
- How much attic stock was indicated in the bamboo flooring submittal?
- What is the most recent submittal with shop drawings for electrical work?
- What is the casing spacer made of in the utility accessories submittal?
- What type of windows are used on our project?
- What submittals pertain to the roof walking mats?
- What is the submittal type for natural gas distribution?
- Which specialty contractor submitted the LED exterior lighting?
- How much attic stock is required for tile carpeting?
- What does the submittal for cable trays indicate about fire rating?
- Does flooring system have any open submittals for their ceramic tile?
- Are the common area casework shop drawings approved?
- Is the ceramic tile submittal currently open?
- How long of a warranty was indicated in the door hardware submittal?
Drawings
- How many large offices are on the third floor in drawing A132?
- What discipline is the Third Floor - Reflected Ceiling Plan drawing under?
- What is the elevation in the exterior elevation drawing on the south side of level 3?
- What is the ADA mounting height of the changing bed?
- What is the abbreviation for the expansion joint in the general information drawing?
- What is the square footage of the mechanical penthouse?
- What is the drawing number for the third floor dimension plan?
- How many square feet is the women's restroom in drawing a112?
- What is the fire rating for solid wood and glass for door 15?
Specifications
- What is the required insulation thickness for copper pipe in the specifications?
- Which specifications require third party testing?
- What specs require owners training?
- What are the warranty requirements for the emergency generator?
- Are the maintenance procedures listed for the elevator system in Specifications?
- What product do we need to use to clean the countertops, per the Submittals?
- Which sections of the Specifications cover sitework and landscaping?
- What is the recommended installation procedure for the carpet?
- Can you show me the roof hatch specification requirements?
- How many shop drawings are we required to submit for review?
- Which Specification section includes air coils?
- What are the warranty requirements for the door hardware?
- What are the required closeout documents for coiling doors?
Documents
- Who are the subcontractors in the Emergency Room compliance report?
- What is the term of warranty for the final finishes?
- What was the description of the incident that occurred on 6/1/24 in the incident report?
- What is the owner-builder declaration for this project?
- Where is the application for the building permit?
How to Use Procore
- How do I create a Submittal package?
- How can I change or reset a password?
- How do I create locations in Procore?
- How do I apply markups from a previous revision to a new Drawing revision?
- How can I create an RFI revision?
- What does "mark official" do in RFIs?
- How do I publish an RFI in the Drawings tool?
- How do I change permissions for an RFI?
- What is a typical workflow for change orders?
- How do I add someone to the Directory?
- How do I grant granular permissions for a project?
- How to submit a bid in Procore?
- How do I create a submittal?
- Where do I upload drawings?
- How do I submit a new subcontractor invoice?