Skip to main content
Procore

Release Notes for 2018-10-08

Below are notable changes to Procore for the week ending Friday, October 5, 2018.


Core | Product Management | Construction Financials | Quality & Safety | Field Productivity | App Marketplace

pl-core.png Core

Admin
Added "Time Tracking" to the Tool Settings Section in Company Admin Tool (10/5/2018)

Added a "Time Tracking" section under Tool Settings in the Company Admin tool. Time Tracking consolidates all of the Timesheets configurations to one page.

pl-project-management.png Product Management

Bidding
Added Document Log PDF for Bid Documents (10/3/2018)

Updated the Project level Bidding tool to add a Document Log PDF for Bid Documents. This PDF is automatically included in 'Bidding Documents' zip downloads. It can also now be downloaded through view pages for Bid Package.

Drawings
Bulk Confirm Drawing Revisions on Review Page (10/4/2018)

Updated the Project level Drawings tool to add the ability to bulk confirm drawing revisions on the review page.

Photos
Photos Digest Email Links Directly to Photo (10/1/2018)

Updated the Photos Digest email so that when you click on a photo, the system now opens the photo viewer in the app (instead of downloading the photo to your computer).

RFIs
Removing Assignee(s) from Ball In Court List Upon Submission of a Response (10/2/2018)

Updated the RFIs tool so that when an assignee submits a response on an RFI that as been assigned multiple assignees, that assignee is removed from the Ball In Court list when they submit a response.

Added 'Project Stage' Drop-Down List to Create, Edit, and View Pages (10/1/2018) 

Updated the Project level RFIs tool to add a Project Stage drop-down list to the tool's Create, Edit, and View pages. See Create an RFI

Specifications
Stopped CSI/CSC Suggestions in the Specs Tool for International Clients (10/2/2018)

For clients outside of the United States and Canada, who are not subject to the CSI Master format from the Construction Specifications Institute (CSI) and Construction Specifications Canada (CSC), the Specifications tool no longer suggests the number of titles on the Specs Review page. 

pl-construction-financials.png Construction Financials

Budget
Added Tooltips Showing International Date Format in Start/End Date Column Headers (10/2/2018)

Previously, there were no tooltips for a monitored resource start and end date columns. Now, there are tooltips that change based on the locale to let the users know the date format required.

Commitments
Rearranged Buttons on Billings Tab (10/3/2018)

Rearranged the display order of the Export and Start New Billing Period buttons on the Billings tab of the Project level Commitments tool.  The Start New Billing Period button is now located to the right of the Export button.

pl-quality-safety.png Quality & Safety

Daily Log
Removed Create Daily Log Button from Sidebar (10/1/2018)

Removed the Create Daily Log button from the sidebar for most Procore clients. The button still appears and is available for use on the Daily Log Beta View. 

Removed Copy Daily Log and Email Buttons from Sidebar (10/1/2018)

Moved the Copy Daily Log and Email buttons from the sidebar to the top of the page.

Punch List
Added Configurable Columns to the Punch Items List Page (10/4/2018)

Added ability to configure columns on all list pages for punch items in the Punch List tool.

 

pl-field-productivity.png Field Productivity

No notables changes.

pl-app-marketplace.png App Marketplace

No notables changes.