Configure the Sync Schedule for Spectrum


To configure the automatic data synchronization schedule for the Procore and Dexter + Chaney Spectrum integration.

Things to Consider

  • Required User Permissions:
    • 'Admin' level permission on the ERP Integrations tool.
  • Additional Information:
    You can configure the sync schedule for the following items:
    • Standard and Project Cost Codes and Project Job Costs
    • Spectrum Vendor list
    • Spectrum Job List


  1. Navigate to the company's ERP Integrations tool.
    This reveals the Dexter + Chaney Spectrum Integration page. 
  2. Click Configure Settings .
  3. Click the Sync Schedule link in the right pane.

  4. Under the Sync Schedule area, choose Hourly, Every 4 HoursDaily (this is the default setting), or Never from the corresponding drop-down list :
    • Sync Standard and Project Cost Codes and Project Job Costs. This automatically syncs the standard and/or project costs codes. It also syncs the project's job costs. 
    • Refresh Spectrum Vendor List. This automatically syncs the vendor list in Spectrum. 
    • Refresh Spectrum Job List.  This automatically syncs the job list in Spectrum. 
  5. Click Update.